11kv overhead line
Pre-Construction Checks
Verify project specifications and design plans
Conduct site survey and environmental assessment
Check for existing utilities and obstacles
Obtain necessary permits and approvals
Material Inspection
Inspect conductors for defects
Check insulators for damage and compliance
Verify the quality of poles and fittings
Ensure grounding materials meet standards
Safety Protocols
Review safety guidelines and procedures
Ensure all personnel are trained and equipped with PPE
Establish emergency response plan
Conduct safety briefing before starting work
Installation Procedures
Mark pole locations and alignment
Install poles securely and align properly
String conductors with proper tension
Install insulators and fittings according to specifications
Quality Assurance
Perform routine checks during installation
Document installation process and any issues
Conduct final inspection of the completed line
Ensure compliance with local electrical codes
Testing and Commissioning
Conduct insulation resistance tests
Perform continuity tests on conductors
Verify grounding system effectiveness
Test system under load conditions
Final Documentation
Compile all inspection and testing reports
Update project drawings and specifications
Submit documentation to relevant authorities
Archive project files for future reference