commissioning of crushing plant
Pre-Commissioning
Ensure all equipment has been installed correctly
Verify all electrical connections have been made
Confirm all safety guards are in place
Check for any leaks or malfunctions
Electrical Commissioning
Test all electrical components for proper functioning
Check voltage levels at all points in the system
Verify emergency shut-off procedures are working correctly
Ensure all alarms and indicators are functioning properly
Mechanical Commissioning
Test all moving parts for proper operation
Check lubrication levels and ensure all systems are properly greased
Verify conveyor belts are tracking correctly
Ensure all motors are running smoothly
Operational Commissioning
Run a test batch of material through the crushing plant
Adjust settings as needed to achieve desired output
Check for any unusual noises or vibrations
Confirm all safety protocols are being followed
Final Checks
Review all documentation and ensure all necessary permits are in place
Perform a final walk-through of the plant to check for any remaining issues
Train operators on proper use and maintenance of the plant
Complete a final inspection and sign-off on the commissioning process.