wooden house construction

Site Preparation

Foundation

  • Use excavating equipment to dig trenches according to the specified dimensions and depth.
  • Ensure that the trenches are level and free from any debris or obstructions.
  • Prepare the concrete mix according to the recommended ratio of cement, sand, and aggregate.
  • Pour the concrete into the trenches, ensuring it reaches the desired height and thickness.
  • Use a screed board or vibrator to level and compact the concrete.
  • Place footings at the bottom of the trenches, ensuring they are properly aligned and level.
  • Secure anchor bolts in the footings, leaving them protruding for future attachment of the structure.
  • Cover the poured concrete with a curing compound or wet burlap to prevent moisture loss.
  • Allow the concrete to cure for the recommended time, typically around 7 days, before proceeding.
  • Place rebar or mesh within the foundation walls according to the structural engineer's specifications.
  • Ensure proper spacing and overlap of reinforcement to provide sufficient strength and stability.
  • Install drainage pipes or channels to divert water away from the foundation.
  • Ensure proper slope and connection to existing drainage systems.
  • Apply a waterproofing membrane or coating to the exterior surface of the foundation walls.
  • Ensure complete coverage and proper adhesion to prevent water infiltration.
  • Install beams, columns, or load-bearing walls to provide support for the upper levels of the wooden house.
  • Ensure proper alignment and connection with the foundation walls.
  • Backfill the excavated soil around the foundation walls in layers, compacting each layer thoroughly.
  • Use compacting equipment or hand tools to achieve the required soil compaction.
  • Engage a structural engineer to conduct a thorough inspection and testing of the foundation's strength and stability.
  • Ensure that the foundation meets all regulatory and safety requirements.

Frame and Structure

Electrical and Plumbing

Insulation and Vapor Barrier

Interior Finishes

Exterior Finishes

Utilities

Final Inspections

Interior and Exterior Finishing Touches

Final Walkthrough and Handover