3.1 Site Preparation 3.1.1 Cut and Fill: 3.1.1.1 Are any cut/fill operations proposed? 3.1.1.2

3.1.1.1 Are any cut/fill operations proposed?

3.1.1.2 If yes, has a site survey been conducted?

3.1.1.3 Have the cut and fill volumes been calculated?

3.1.1.4 Is there a plan for erosion control during cut/fill operations?

3.1.1.5 Have the soil types been identified and evaluated?

3.1.1.6 Is there a plan for managing excess soil?

3.1.1.7 Have environmental impacts been assessed?

3.1.1.8 Are necessary permits in place for cut/fill operations?

3.1.1.9 Have safety measures been established for the operation?

3.1.1.10 Is there a timeline established for completion of cut/fill operations?

3.1.1.11 Are there contingency plans in case of adverse weather during operations?