3.1.1.1 Are any cut/fill operations proposed?
3.1.1.2 If yes, has a site survey been conducted?
3.1.1.3 Have the cut and fill volumes been calculated?
3.1.1.4 Is there a plan for erosion control during cut/fill operations?
3.1.1.5 Have the soil types been identified and evaluated?
3.1.1.6 Is there a plan for managing excess soil?
3.1.1.7 Have environmental impacts been assessed?
3.1.1.8 Are necessary permits in place for cut/fill operations?
3.1.1.9 Have safety measures been established for the operation?
3.1.1.10 Is there a timeline established for completion of cut/fill operations?
3.1.1.11 Are there contingency plans in case of adverse weather during operations?