change management process for installing new software across the business

Pre-Implementation Checklist

Vendor Selection Checklist

Technical Preparation Checklist

  • Review the system requirements provided by the software vendor
  • Check if the existing hardware and software meet the minimum requirements
  • Identify any necessary upgrades or additional resources
  • Evaluate the current infrastructure to identify any gaps or limitations
  • Determine if any upgrades or modifications are required to support the new software
  • Consider factors such as network bandwidth, storage capacity, and server availability
  • Identify the required licenses for the new software
  • Ensure that the organization is compliant with legal and regulatory requirements
  • Obtain the necessary licenses and maintain documentation for auditing purposes
  • Assess the current data security measures in place
  • Identify any gaps or vulnerabilities
  • Implement necessary safeguards such as encryption, access controls, and monitoring
  • Analyze the data that needs to be migrated to the new software
  • Develop a plan to transfer the data while ensuring data integrity and minimizing downtime
  • Consider factors such as data mapping, data cleansing, and data validation
  • Identify the existing systems and software that will interact with the new software
  • Perform compatibility testing to ensure smooth integration
  • Address any compatibility issues or conflicts that arise
  • Create separate test environments to simulate the production environment
  • Install the new software in the test environments
  • Test the functionality, performance, and compatibility of the new software
  • Develop a plan to backup and restore the new software and its associated data
  • Consider factors such as backup frequency, backup storage location, and recovery procedures
  • Test the backup and recovery plan to ensure its effectiveness
  • Review and update the system configurations to accommodate the new software
  • Document the changes made to the system configurations
  • Ensure that the documentation is accurate and up to date
  • Identify any patches or updates required for the new software
  • Apply the necessary patches and updates to ensure the software is up to date
  • Install antivirus protection to safeguard against malware and security threats
  • Define user roles and permissions for accessing the new software
  • Implement access control measures such as user authentication and authorization
  • Regularly review and update user access control settings as needed
  • Develop user documentation to guide users on how to use the new software
  • Create training materials such as user manuals, tutorials, and videos
  • Ensure that the documentation and training materials are comprehensive and easy to understand

User Training and Communication Checklist

  • Create a list of all user groups in the business
  • Determine the specific training needs for each user group
  • Create training materials and user guides relevant to the new software
  • Include step-by-step instructions and visual aids in the materials
  • Set dates and times for training sessions
  • Invite employees to attend the sessions
  • Conduct the training sessions in a suitable location
  • Create a communication plan
  • Use various channels (e.g., email, meetings, presentations) to inform stakeholders about the benefits and purpose of the new software
  • Encourage open communication and feedback from employees
  • Address concerns and resistance promptly and constructively
  • Establish support channels such as a helpdesk or online support portal
  • Ensure users know how to access and utilize these support channels
  • Create a feedback mechanism (e.g., online form, suggestion box)
  • Encourage users to provide feedback on their experience with the new software
  • Identify users who require additional training
  • Schedule refresher training sessions for these users
  • Review user access rights and permissions for the new software
  • Ensure all employees have the appropriate access levels
  • Track user activity and usage statistics
  • Gather feedback from users to evaluate the effectiveness of the new software implementation

Go-Live Checklist

  • Perform comprehensive testing of the new software to ensure it functions properly
  • Document and address any bugs or issues identified during testing
  • Create a detailed plan outlining the steps and timeline for deploying the new software
  • Coordinate with IT, operations, and other relevant teams to ensure smooth implementation
  • Notify all users about the scheduled go-live date and time
  • Inform users of any expected downtime or system unavailability during the implementation
  • Follow the deployment plan to install and configure the new software
  • Ensure all necessary components and dependencies are properly installed
  • Continuously monitor the system's performance and stability
  • Watch for any errors or issues that arise during the initial implementation phase
  • Promptly respond to and resolve any user concerns or technical issues that arise
  • Provide support and assistance to users experiencing difficulties with the new software
  • Gather feedback from users about their experience with the new software
  • Analyze the feedback and make any necessary adjustments or improvements to enhance usability and functionality

Post-Implementation Review Checklist