FOUNDATION AND EXCAVATION
Obtain necessary permits and approvals
Clear the construction site
Excavate and level the area
Install drainage system
Pour concrete footings and foundation walls
FRAMING
Construct the house frame, including walls, roof, and floors
Install exterior sheathing
Install windows and doors
Install roof trusses or rafters
Install house wrap
MECHANICALS
Install plumbing system
Install electrical system
Install HVAC system (heating, ventilation, and air conditioning)
Install insulation
EXTERIOR
Install siding or exterior cladding
Install gutters and downspouts
Install exterior trim and accents
Paint or finish exterior surfaces
Install landscape features (if desired)
INTERIOR
Complete rough-in plumbing and electrical
Install drywall
Finish walls and ceilings (painting, wallpaper, etc.)
Install flooring (carpet, tile, hardwood, etc.)
Install interior doors and trim
FIXTURES AND FINISHES
Install kitchen cabinets and countertops
Install bathroom fixtures (toilet, shower, bathtub, etc.)
Install lighting fixtures
Install interior hardware (doorknobs, handles, etc.)
Complete final painting and touch-ups
FINAL TOUCHES
Perform final inspections
Clean the interior and exterior of the house
Install appliances (oven, dishwasher, etc.)
Install final plumbing and electrical fixtures
Conduct final walkthrough with contractors and clients
MOVING IN
Obtain occupancy permit
Transfer utilities to the new house
Move furniture and personal belongings
Set up necessary services (internet, cable, etc.)
Celebrate and enjoy your new home!