Generator Relocation Checklist
Pre-Relocation Preparations
Obtain necessary permits for relocation.
Schedule a date and time for relocation with appropriate personnel.
Ensure all maintenance checks are up to date.
Notify local authorities and utility companies of the relocation plans
Conduct a risk assessment and develop a relocation plan
Secure necessary equipment and resources for the relocation process
Communicate with all stakeholders and personnel involved in the relocation
Generator Shutdown
Disconnect power source to generator.
Turn off generator and allow to cool down.
Secure any loose parts or covers.
Drain fuel from the generator
Disconnect and remove any attached fuel lines
Shut off any gas supply valves
Disconnect and remove any electrical connections
Remove any additional accessories or components
Perform a final visual inspection to ensure everything is properly disconnected and secured
Transportation Preparations
Ensure transportation vehicle is suitable for generator size and weight.
Secure generator to vehicle with appropriate straps or restraints.
Check weather conditions for safe transportation
Verify transportation route for any restrictions or obstacles
Obtain necessary permits for oversized load, if applicable
Coordinate with transportation company for scheduling and logistics
Inspect vehicle tires and brakes for safe operation
Generator Re-Installation
Position generator in new location according to safety guidelines.
Reconnect power source to generator.
Test generator to ensure proper functioning.
Secure generator in place with appropriate anchoring or mounting
Check all electrical connections for proper installation and secure any loose connections
Conduct a load test to ensure the generator can handle the required electrical load
Update any necessary documentation or labels to reflect the new location of the generator
Post-Relocation Checklist
Perform final inspection of generator for any damages.
Update maintenance logs with new location and relocation date.
Notify appropriate personnel of successful relocation.
Test generator functionality to ensure proper operation
Conduct load bank testing to verify performance under load
Verify all connections and wiring are secure
Update emergency contact information for new location
Schedule routine maintenance checks for new location