A detailed Air Cooled Transformer SEMI ANNUAL preventive maintenance checklists

1. Visual Inspection

2. Electrical Testing

  • Use a multimeter to measure voltage.
  • Record readings for both input and output.
  • Ensure measurements are taken under normal operating conditions.
  • Compare with manufacturer specifications for acceptance.
  • Disconnect power to the transformer.
  • Connect megohmmeter leads to winding terminals.
  • Set megohmmeter to appropriate voltage rating.
  • Record insulation resistance values for all windings.
  • Disconnect the transformer from the load.
  • Connect power factor test equipment.
  • Run the test to measure power factor.
  • Document results for future reference.
  • Turn off power supply before inspection.
  • Check all terminals and connections for corrosion.
  • Clean connections using appropriate tools.
  • Re-tighten connections to manufacturer torque specifications.
  • Inspect fuses for physical damage or corrosion.
  • Test circuit breakers for proper operation.
  • Reset any tripped breakers after testing.
  • Document status and any needed replacements.
  • Connect the phase rotation meter to the input terminals.
  • Power on the meter and observe the phase sequence.
  • Ensure the phase rotation matches the system requirements.
  • Document the phase rotation results.
  • Use a clamp meter to measure current on each phase.
  • Record current readings for all three phases.
  • Ensure measurements are taken under full load conditions.
  • Compare with rated current specifications.
  • Connect the power quality analyzer to the supply.
  • Run the analysis to check for harmonic levels.
  • Record harmonic distortion percentages.
  • Assess if harmonics exceed acceptable limits.
  • Run the transformer at full load conditions.
  • Measure and record temperature at various points.
  • Compare readings against manufacturer’s temperature rise limits.
  • Document any deviations for further analysis.
  • Disconnect the relay from the system.
  • Use secondary injection equipment to simulate faults.
  • Check relay operation against specified settings.
  • Document the relay response times and actions.
  • Check grounding connections for corrosion and damage.
  • Use an earth resistance tester to measure grounding resistance.
  • Ensure readings are within acceptable limits.
  • Document findings and any corrective actions taken.
  • Connect load bank to the transformer output.
  • Gradually apply load up to rated capacity.
  • Monitor temperature and performance during the test.
  • Document results and any anomalies.
  • Measure operating temperature during normal conditions.
  • Compare with the manufacturer’s specified temperature range.
  • Document any discrepancies and assess implications.
  • Plan for corrective actions if necessary.
  • Record all test results in maintenance logs.
  • Highlight any deviations from normal parameters.
  • Include recommendations for further investigation.
  • Ensure documentation is accessible for future reference.
  • Verify calibration certificates for all test equipment.
  • Inspect equipment for physical damage or wear.
  • Test equipment on known standards for functionality.
  • Document the calibration status of each tool.

3. Cooling System Evaluation

  • Remove air filters from housing.
  • Inspect for dirt, dust, or damage.
  • Use compressed air to clean filters if reusable.
  • Replace filters if heavily soiled or damaged.
  • Reinstall filters securely in the housing.
  • Power on cooling fans and observe operation.
  • Listen for unusual noises indicating malfunction.
  • Check fan speed and ensure it meets specifications.
  • Look for any vibrations that may suggest misalignment.
  • Verify that the fans are securely mounted.
  • Use a digital thermometer to measure ambient temperature.
  • Compare readings with manufacturer's specified range.
  • Identify any heat sources nearby that could affect readings.
  • Document temperature findings for maintenance records.
  • Take corrective actions if temperatures exceed limits.
  • Check coolant reservoir for appropriate levels.
  • Inspect hoses and connections for leaks or damage.
  • Top up coolant as needed with the correct type.
  • Clean any spills immediately to prevent hazards.
  • Document coolant levels in maintenance logs.
  • Visually examine heat exchangers for debris or obstructions.
  • Check for corrosion or signs of deterioration.
  • Remove any blockages found in airflow paths.
  • Ensure all connections are tight and leak-free.
  • Record condition of heat exchangers for future reference.
  • Use a reliable thermometer or thermal imaging device.
  • Measure the temperature at the inlet and outlet.
  • Calculate the differential and compare with specifications.
  • Document findings for future reference.
  • Visually examine ductwork for blockages or dents.
  • Remove any debris or foreign objects.
  • Check for loose fittings and secure as necessary.
  • Document the condition of the ductwork.
  • Use appropriate temperature measurement tools.
  • Record the temperature at designated points.
  • Compare with the manufacturer's specified limits.
  • Note any deviations for further investigation.
  • Simulate conditions to trigger automatic controls.
  • Observe the response of the system.
  • Check for any error messages or malfunctions.
  • Document the operational status of controls.
  • Use a soft brush or vacuum cleaner for cleaning.
  • Ensure no damage occurs to fins during cleaning.
  • Check for any signs of corrosion or wear.
  • Document the cleanliness status post-maintenance.
  • Inspect connections visually for corrosion or wear.
  • Tighten any loose connections appropriately.
  • Use a multimeter to check for continuity.
  • Document the condition of electrical connections.
  • Use a vibration meter to assess fan operation.
  • Listen for unusual noises during operation.
  • Check for any signs of misalignment or wear.
  • Document vibration levels and any concerns.
  • Perform a visual inspection of all components.
  • Look for signs of rust, leaks, or wear.
  • Compare current condition with previous records.
  • Document any concerns or needed repairs.
  • Test each safety interlock for functionality.
  • Check alarm systems for audible and visual alerts.
  • Document the status of each safety feature.
  • Address any non-functional components immediately.
  • Obtain the latest manufacturer guidelines.
  • Compare current practices with recommendations.
  • Make notes on any deviations from recommendations.
  • Document compliance status and necessary adjustments.

4. Grounding and Bonding

  • Inspect all grounding connections visually.
  • Ensure all bolts and clamps are tight.
  • Check for physical damage to wires.
  • Look for signs of overheating or wear.
  • Confirm connections to the transformer are stable.
  • Use a calibrated ground resistance meter.
  • Test at various points in the grounding system.
  • Record resistance values for comparison.
  • Ensure values are within manufacturer specifications.
  • Re-test if initial readings are above expected limits.
  • Check all bonding straps for physical integrity.
  • Look for rust or corrosion on metal surfaces.
  • Clean any corroded areas with a wire brush.
  • Ensure connections are tight and secure.
  • Replace damaged straps or connections as needed.
  • Use a multimeter to check continuity.
  • Test between grounding points and neutral.
  • Ensure no breaks in the grounding path.
  • Document continuity test results.
  • Address any interruptions found during testing.
  • Inspect all grounding electrodes.
  • Ensure they are securely installed.
  • Look for any corrosion or damage.
  • Verify connections to the transformer.
  • Refer to local electrical codes.
  • Measure conductor gauge and type.
  • Ensure compliance with standards.
  • Replace any undersized or inappropriate conductors.
  • Check for physical damage to grounding components.
  • Look for rust or corrosion on connections.
  • Assess the condition of grounding rods.
  • Replace any deteriorated parts immediately.
  • Verify grounding for all connected equipment.
  • Check continuity of ground connections.
  • Inspect for loose or damaged connections.
  • Re-secure or replace grounding as needed.
  • Perform a ground resistance test.
  • Evaluate the grounding system's response to fault conditions.
  • Document resistance measurements.
  • Identify any areas requiring improvement.
  • Record all findings in maintenance logs.
  • Note specific locations of issues.
  • Include photographs if applicable.
  • Communicate findings to relevant personnel.
  • Consult engineering designs and specifications.
  • Cross-reference with current codes.
  • Identify any discrepancies.
  • Recommend updates if necessary.
  • Check labels on all grounding connections.
  • Ensure visibility and clarity of labels.
  • Replace any missing or unclear labels.
  • Standardize labeling format across the system.
  • Conduct fault simulation tests.
  • Monitor system response to faults.
  • Assess effectiveness of grounding under load.
  • Document performance results for analysis.
  • Review inspection documentation.
  • Prioritize necessary repairs or upgrades.
  • Set a timeline for completion.
  • Assign personnel for follow-up tasks.

5. Documentation and Reporting

6. Safety and Compliance

7. Follow-Up Actions

Related Checklists