A detailed Deaerator DAILY preventive maintenance checklists

General Inspection

  • Examine all joints, seams, and connections.
  • Look for water stains or rust.
  • Use a flashlight for hard-to-see areas.
  • Listen for hissing sounds indicating gas leaks.
  • Document any leaks and notify maintenance.
  • Look for discoloration, pitting, or flaking.
  • Check weld seams and joints for integrity.
  • Use a wire brush to remove surface rust.
  • Note any areas requiring immediate attention.
  • Schedule repairs as necessary.
  • Check for missing screws or fasteners.
  • Inspect hinges and latches for functionality.
  • Look for signs of damage or wear.
  • Ensure panels close tightly without gaps.
  • Replace any damaged components promptly.
  • Check for visible tears or abrasions.
  • Look for signs of moisture or mold.
  • Ensure insulation is securely fastened.
  • Inspect for any exposed areas.
  • Replace damaged insulation as needed.
  • Verify that pumps and motors are level.
  • Inspect couplings for proper fit and wear.
  • Check for misalignment signs, such as vibration.
  • Adjust components as necessary.
  • Document any alignment issues for follow-up.
  • Check for missing or damaged guards.
  • Ensure all covers are secured tightly.
  • Inspect for any obstructions to moving parts.
  • Test functionality of safety features.
  • Report any deficiencies immediately.
  • Look for debris or obstructions in the stack.
  • Inspect for rust, cracks, or corrosion.
  • Ensure vent is securely attached.
  • Check for proper airflow.
  • Schedule cleaning or repairs as necessary.
  • Check for accurate readings on all gauges.
  • Test instruments against known standards.
  • Inspect for physical damage to gauges.
  • Calibrate instruments as required.
  • Document any discrepancies for maintenance records.
  • Listen for unusual sounds during operation.
  • Check for excessive vibration using a gauge.
  • Inspect mounting points for looseness.
  • Identify any sources of noise.
  • Plan for repairs if abnormalities are found.
  • Look for cracks or settling in the foundation.
  • Check supports for rust or corrosion.
  • Ensure all bolts are tightened.
  • Examine for any signs of shifting.
  • Document any structural concerns immediately.
  • Inspect drainage channels for blockages.
  • Ensure proper slope towards drainage.
  • Look for signs of pooling or water damage.
  • Clear any debris from drainage areas.
  • Report drainage issues to maintenance.
  • Inspect labels for wear or fading.
  • Ensure all safety and operational labels are present.
  • Replace any illegible labels.
  • Check for compliance with current standards.
  • Document any labeling issues for corrective action.
  • Inspect filters for dirt and debris buildup.
  • Check strainers for blockages.
  • Assess the condition and age of filters.
  • Clean or replace as necessary.
  • Document filter conditions and actions taken.

Level Check

  • Observe the level gauge and note the current water level.
  • Compare the observed level against the specified operating range.
  • Ensure the level is neither too low nor too high.
  • Report any deviations from the operating range immediately.
  • Inspect control system for any visible damage or issues.
  • Verify that control signals are being transmitted correctly.
  • Listen for any unusual sounds indicating malfunction.
  • Test the responsiveness of the control system to adjustments.
  • Examine the gauge for any obstructions or dirt.
  • Clean the gauge if visibility is compromised.
  • Ensure the gauge is securely mounted and not vibrating.
  • Check for any signs of wear or damage to the gauge.
  • Check calibration settings against manufacturer specifications.
  • Perform a simulation test to verify output accuracy.
  • Ensure connections are secure and free from corrosion.
  • Document calibration results and any adjustments made.
  • Inspect all connections and seals for moisture or dripping.
  • Look for any corrosion or damage that could indicate leaks.
  • Use a cloth to wipe away moisture for a clearer view.
  • Report any leaks found immediately for further action.
  • Simulate low and high water levels to trigger alarms.
  • Listen for alarm sounds and check indicator lights.
  • Verify alarm signals are sent to the control room.
  • Document test results and any malfunctions encountered.
  • Manually operate the valves to check their movement.
  • Observe valves for any signs of sticking or sluggishness.
  • Ensure valves are fully opening and closing without obstruction.
  • Document valve performance and any issues noted.
  • Check the float for any signs of damage or corrosion.
  • Ensure the float moves freely without any obstruction.
  • Test the mechanism for responsiveness to water level changes.
  • Lubricate moving parts if necessary to ensure smooth operation.
  • Record the current water level in the maintenance log.
  • Note any irregularities or concerns observed during inspection.
  • Include date and time of the reading for reference.
  • Ensure documentation is clear and accessible for future reviews.
  • Observe the system during operation to ensure functionality.
  • Check for proper water flow and pressure during the test.
  • Verify that the system automatically adjusts to maintain levels.
  • Document test results and any discrepancies noted.
  • Inspect the bottom of the deaerator for any buildup.
  • Remove any visible sediment or debris present.
  • Look for blockages in the level measurement area.
  • Document any findings and ensure cleaning is performed if necessary.
  • Access the historical data logs for water levels.
  • Identify any patterns or significant deviations over time.
  • Note trends that could indicate potential issues or concerns.
  • Prepare a summary report for management review if necessary.

Temperature and Pressure Monitoring

  • Use calibrated thermometers or temperature sensors.
  • Document temperatures in a logbook or digital system.
  • Ensure readings are taken at consistent intervals.
  • Compare readings with operational standards.
  • Check pressure gauges for accuracy and functionality.
  • Record pressure readings in the maintenance log.
  • Ensure readings are within manufacturer specifications.
  • Investigate any readings outside of normal range.
  • Use standard calibration equipment to check gauges.
  • Adjust or replace gauges as necessary.
  • Document calibration dates and results.
  • Ensure compliance with industry standards.
  • Look for signs of wear such as cracks or tears.
  • Check insulation material for moisture or degradation.
  • Replace damaged insulation to maintain efficiency.
  • Document any findings and corrective actions taken.
  • Review readings for consistency over time.
  • Identify patterns that deviate from normal operation.
  • Investigate potential causes for fluctuations.
  • Document findings for future reference.
  • Maintain a historical log of temperature and pressure data.
  • Highlight discrepancies for further analysis.
  • Use data for trend analysis and predictive maintenance.
  • Discuss findings with the maintenance team.
  • Inspect valves for visible signs of wear or leakage.
  • Test valve operation under controlled conditions.
  • Document any malfunctions or maintenance performed.
  • Replace valves that do not meet safety standards.
  • Use a thermometer to measure surrounding temperatures.
  • Record ambient temperature in the maintenance log.
  • Evaluate any impact on deaerator operation.
  • Take corrective actions if necessary.
  • Inspect equipment for dirt or debris.
  • Clean sensors and gauges as needed.
  • Ensure clear visibility and access to all equipment.
  • Document cleaning activities in maintenance records.
  • Test the system by making controlled adjustments.
  • Record the time taken for the system to respond.
  • Compare results against expected performance metrics.
  • Document any delays or issues observed.
  • Analyze historical data for patterns or anomalies.
  • Generate reports summarizing trends.
  • Identify potential areas for improvement.
  • Share findings with operational teams.
  • Confirm operating conditions against design specifications.
  • Adjust settings as needed to align with profiles.
  • Document any adjustments made during the process.
  • Monitor closely for compliance.
  • Keep detailed records of all maintenance activities.
  • Note dates, times, and personnel involved.
  • Include descriptions of any adjustments or repairs.
  • Ensure records are accessible for future reference.

Vent and Drain Operation

  • Open the vent valve slowly and observe its movement.
  • Check for any unusual noises during operation.
  • Look for debris or blockages around the valve.
  • Ensure the valve fully opens and closes without resistance.
  • Manually operate the drain valve to assess smoothness.
  • Listen for any grinding or sticking sounds.
  • Check for fluid leakage around the valve during operation.
  • Ensure the valve returns to the closed position securely.
  • Visually inspect all vent lines for visible blockages.
  • Check connections for signs of leaks or wear.
  • Use a flashlight to examine hard-to-see areas.
  • Clear any obstructions and repair leaks as needed.
  • Inspect gaskets and seals for integrity.
  • Look for signs of wear or deterioration.
  • Ensure valves are tightened to manufacturer specifications.
  • Replace any damaged seals or gaskets immediately.
  • Examine the length of drain piping for rust or corrosion.
  • Check for cracks, leaks, or bulges in the pipe.
  • Assess joints and connections for stability.
  • Document any findings and schedule repairs as necessary.
  • Use the appropriate tools to check tightness of all fasteners.
  • Look for any loose or missing screws or bolts.
  • Ensure the drain valve is firmly attached to the piping.
  • Replace any missing fasteners immediately.
  • Measure the flow rate using a calibrated flow meter.
  • Compare measurements to standard operational parameters.
  • Document any discrepancies and investigate causes.
  • Adjust operations or maintenance as necessary.
  • Record all observations and measurements taken.
  • Note any issues or repairs performed.
  • Update maintenance records promptly.
  • Ensure log is easily accessible for future reference.
  • Check that labels are legible and securely attached.
  • Replace any missing or damaged labels immediately.
  • Verify that labels accurately describe valve functions.
  • Position labels where they can be easily seen.
  • Inspect insulation for damage or wear.
  • Ensure insulation is intact and covers all exposed areas.
  • Replace any sections of insulation that are missing.
  • Verify that insulation is suitable for the operating temperature.
  • Activate each alarm or indicator manually.
  • Confirm that all alarms sound or illuminate as expected.
  • Check for accurate readings on indicator displays.
  • Document any malfunctions for repair.
  • Inspect the floor and surrounding area for water.
  • Check for dampness or unusual moisture levels.
  • Note any signs of leaks and address immediately.
  • Ensure area is kept clear for easy monitoring.

Water Quality Assessment

  • Use a clean, sterilized container for sampling.
  • Collect water from the deaerator’s outlet.
  • Ensure the sample is representative of the overall water.
  • Label the sample with date, time, and location.
  • Transport sample to the testing facility promptly.
  • Inspect chemical feed pumps for proper functionality.
  • Verify chemical levels in storage tanks are sufficient.
  • Check for leaks in the chemical feed lines.
  • Ensure chemical dosing rates are set according to specifications.
  • Document any discrepancies for immediate resolution.
  • Calibrate the pH meter before use.
  • Immerse the pH probe in the water sample.
  • Record the pH reading once stabilized.
  • Compare the reading against acceptable pH range.
  • Adjust chemical feed if pH is outside acceptable limits.
  • Visual inspection for turbidity or discoloration.
  • Use filtration methods to identify particulates.
  • Perform chemical tests for specific contaminants.
  • Document any findings and their potential impacts.
  • Report significant contaminants to management.
  • Calibrate the TDS meter as per manufacturer instructions.
  • Dip the TDS meter into the water sample.
  • Wait for the reading to stabilize.
  • Record the TDS value.
  • Compare results with acceptable water quality standards.
  • Check calibration certificates of all equipment.
  • Perform routine checks as per manufacturer guidelines.
  • Ensure all equipment is clean and functional.
  • Document any maintenance or calibration performed.
  • Schedule any needed recalibrations as required.
  • Conduct a visual inspection of all internal surfaces.
  • Use appropriate tools to check for scale buildup.
  • Record areas showing corrosion or scaling.
  • Plan for cleaning or treatment if necessary.
  • Document findings for future reference.
  • Collect a water sample for chemical analysis.
  • Use testing methods to determine residual levels.
  • Compare results with expected residual levels.
  • Adjust chemical feed if levels are inadequate.
  • Document residual levels and actions taken.
  • Compile all water quality test results.
  • Create a comparison chart with historical data.
  • Identify trends or deviations from benchmarks.
  • Discuss findings in team meetings for action planning.
  • Maintain records for compliance and audits.
  • Use a calibrated thermometer to measure temperature.
  • Ensure the thermometer is immersed properly in the sample.
  • Record the temperature reading accurately.
  • Verify that the temperature is within testing range.
  • Adjust testing procedures if temperature is not suitable.
  • Visual check for obstructions at inlet and outlet.
  • Use tools to clear any visible blockages.
  • Check flow rates to ensure they are within ranges.
  • Document any irregularities for corrective action.
  • Schedule regular inspections to prevent future issues.
  • Use a standardized form for documentation.
  • Include date, time, and description of issues.
  • Assign responsibility for follow-up actions.
  • Set deadlines for resolution of identified issues.
  • Ensure records are accessible for future reference.

Safety and Emergency Systems

Electrical and Control Systems

Documentation

Follow-Up Actions

Related Checklists