Preparation for Piston Pull
Review manufacturer's guidelines for piston pull procedure
Obtain necessary tools and equipment
Ensure proper personal protective equipment is worn
Conduct a safety briefing with all involved personnel
Secure necessary permits for engine room work
Check for any potential hazards or obstacles in the work area
Verify that engine is shut down and all systems are properly isolated
Confirm that all relevant valves are closed and tagged out
Assign specific roles and responsibilities to each member of the team
Preparation of Engine Room
Inform engine room personnel of piston pull operation
Shut down main engine and secure all power sources
Ventilate engine room to remove any fumes or gases
Ensure all necessary tools and equipment are readily available
Remove any obstacles or obstructions in the engine room to allow for easy access to the main engine
Check and ensure all safety measures are in place, such as fire extinguishers and emergency stop buttons
Coordinate with other departments to ensure minimal disruption to ship operations during piston pull operation
Conduct a final safety inspection of the engine room before proceeding with the piston pull
Preparation of Piston
Drain lubricating oil from piston area
Remove cylinder head and exhaust valves
Disconnect piston cooling system
Disconnect fuel injection system
Remove connecting rod bolts
Secure lifting equipment for piston removal
Inspect piston rings for wear and damage
Removal of Piston
Loosen connecting rod bolts and remove piston rod
Use hoisting equipment to lift piston out of cylinder
Inspect piston for any damage or wear
Cleaning and Inspection
Clean piston and cylinder bore
Inspect piston rings for wear and replace if necessary
Check cylinder liner for any damage or scoring
Reinstallation of Piston
Install new piston rings onto piston
Lower piston back into cylinder using hoisting equipment
Reconnect piston rod and tighten connecting rod bolts
Testing and Commissioning
Conduct pressure test on cylinder to ensure proper sealing
Start main engine and check for any abnormal vibrations or noises
Monitor engine performance during sea trials.
Check for any leaks in the piston area
Measure and record piston clearance and alignment
Verify proper lubrication of piston and piston rings
Conduct a performance test to ensure the piston is operating efficiently and effectively
Monitor piston temperature during operation
Perform a final inspection of the piston and surrounding components before finalizing commissioning