hydrogen generation and dispensing station audit checklist as per NFPA 2

Pre-audit Preparation

Site Inspection

Hydrogen Generation System

Hydrogen Dispensing System

Emergency Response

Documentation and Record Keeping

  • Check for regular maintenance schedules and documented maintenance activities
  • Verify that any maintenance issues or repairs were addressed in a timely manner
  • Ensure that safety systems have been inspected and tested as required by regulations
  • Verify that any deficiencies found during inspections were properly addressed
  • Check expiration dates on permits and approvals
  • Verify that any renewals or updates have been completed
  • Check for documented incidents involving hydrogen equipment
  • Verify that corrective actions were taken and documented
  • Verify that employees have received proper training on handling hydrogen safely
  • Check for any refresher training that may be required
  • Ensure that manuals and procedures are easily accessible to employees
  • Verify that any updates or revisions to manuals have been implemented
  • Check for regular calibration schedules for monitoring and control systems
  • Verify that calibration activities were completed as scheduled
  • Verify that safety data sheets are up to date and readily accessible
  • Check for any new chemicals introduced that may require updated safety data sheets
  • Verify that any regulatory audits or inspections were conducted as required
  • Review findings and ensure that any recommendations or requirements have been addressed
  • Check expiration dates on certifications for equipment and personnel
  • Verify that any required recertifications have been completed

Post-audit Follow-up

Related Checklists