To install new hardware

Preparation

Procurement

Installation

  • Consider factors such as ventilation, accessibility, and space requirements
  • Ensure the location is free from potential hazards or interference
  • Check power requirements and ensure the availability of appropriate outlets
  • Connect any necessary cables or wires to the hardware
  • Power on the hardware and check for any error messages or unusual behavior
  • Verify that all components are recognized and functioning correctly
  • Use appropriate tools to securely attach the hardware to the designated location
  • Ensure the hardware is stable and properly supported
  • Perform a comprehensive test of all hardware functions and features
  • Verify that the hardware is able to perform its intended tasks without issues

Configuration

Testing

Documentation

Related Checklists