Your checklists (
0
)
AI Checklist Generator
From the makers of
Manifestly Checklists
Sign in
Email address
Email me a magic link
Home
> setup processo de tubos pead
setup processo de tubos pead
Preparation of Site
Clearing and leveling of the site
Marking of the location for the HDPE pipes
Ensuring proper drainage and slope for the pipes
Preparation of Pipes
Unloading the HDPE pipes carefully to avoid damage
Inspecting each pipe for any defects or damages
Storing the pipes in a safe and dry location
Installation of Pipes
Excavating trenches according to the marked locations
Laying the pipes in the trenches with proper alignment
Connecting the pipes using appropriate fittings and joints
Backfilling and Compaction
Filling the trenches with suitable backfill material
Compacting the backfill in layers to prevent settlement
Ensuring proper compaction around the pipes to avoid damage
Testing and Commissioning
Conducting pressure and leakage tests on the installed pipes
Flushing and disinfecting the pipes as per regulations
Commissioning the pipeline for operation
Documentation and Record Keeping
Keeping detailed records of the setup process
Documenting any deviations from the checklist
Maintaining as-built drawings and specifications for future reference
Download CSV
Download JSON
Download Markdown
Use in Manifestly