Capping material mixing and placing after rain

Pre-Preparation Steps

Material Mixing Requirements

Placing Capping Material

  • Inspect the area for water accumulation.
  • Use pumps or brooms to remove water.
  • Clear away any debris like leaves or stones.
  • Ensure the surface is clean and stable.
  • Select machinery based on material type.
  • Calibrate equipment for even distribution.
  • Spread capping material in uniform layers.
  • Level the surface using rakes or graders.
  • Check thickness at multiple points.
  • Use a measuring tool for accuracy.
  • Ensure coverage meets project specifications.
  • Make adjustments as necessary during placement.

Post-Placement Procedures

Documentation and Reporting

Related Checklists