Electrical System
Verify all electrical components are properly installed and connected
Check for any loose or exposed wires
Test all electrical circuits for proper functioning
Ensure emergency shut off switches are in place and working correctly
Mechanical System
Inspect all moving parts for proper alignment and lubrication
Test all motors and drives for correct operation
Check for any unusual vibrations or noises during operation
Ensure all safety guards and barriers are in place
Hydraulic System
Inspect all hydraulic hoses and connections for leaks or damage
Test all hydraulic cylinders and valves for proper function
Check hydraulic fluid levels and top up if necessary
Ensure emergency stop valves are in place and functioning correctly
Control System
Verify all sensors and switches are correctly calibrated
Test all control panels and PLCs for proper operation
Check all emergency stop buttons and alarms for functionality
Ensure all safety interlocks are in place and working correctly
Commissioning Process
Run a test batch of material through the crushing plant
Adjust settings and parameters as needed for optimal performance
Record all data and performance metrics during commissioning process
Train plant operators on proper operation and maintenance procedures
Final Checks
Verify all documentation and manuals are complete and organized
Perform a final walk-through of the entire plant to check for any issues
Ensure all safety signs and labels are in place and clearly visible
Schedule regular maintenance checks and inspections for ongoing plant performance.