checklist for checking electrical points chasing marked at site

1. Pre-Inspection Preparation

2. Site Assessment

3. Verification of Marked Points

4. Chasing Inspection

  • Use a measuring tape to verify depth and width.
  • Ensure measurements match project specifications.
  • Inspect each point individually for consistency.
  • Document any discrepancies for reporting.
  • Review project specifications prior to inspection.
  • Check alignment with approved drawings.
  • Ensure proper tools and techniques were used.
  • Assess overall quality of the chasing work.
  • Inspect adjacent walls and surfaces for cracks.
  • Look for signs of structural integrity compromise.
  • Document any observed damages with photos.
  • Report damages to the project manager immediately.

5. Quality Control

  • Use a level to check horizontal alignment.
  • Confirm vertical alignment with a plumb line.
  • Measure distances from walls to conduits and boxes.
  • Adjust placements as needed for compliance.
  • Review project specifications and standards.
  • Inspect labels and certifications on materials.
  • Check for compatibility with project requirements.
  • Document any discrepancies for reporting.
  • Conduct a visual inspection of the chased areas.
  • Remove any loose debris or obstructions.
  • Ensure clear access for installation and inspection.
  • Report any issues that may affect installation.

6. Documentation

7. Final Review

Related Checklists