1. Pre-Installation Preparation
2. Site and Foundation Readiness
3. Equipment Installation
4. Piping and Connections
5. Electrical and Control Systems
6. Final Inspection and Testing
7. Documentation and Handover
8. Safety and Environmental Compliance
9. Training and Commissioning