Your checklists (
0
)
AI Checklist Generator
From the makers of
Manifestly Checklists
Sign in
Email address
Email me a magic link
Home
> Checklist for PV Solar Plant SCADA
Checklist for PV Solar Plant SCADA
1. Preliminary Setup
Ensure all SCADA hardware components are installed correctly.
Verify the installation of software applications and tools.
Confirm network connectivity and communication protocols.
2. System Configuration
Configure data acquisition settings for inverters and sensors.
Set up user roles and access permissions in the SCADA system.
Establish alarm thresholds and notifications for critical parameters.
3. Data Monitoring
Verify real-time data collection from all plant components.
Check data accuracy and integrity through sample testing.
Ensure visualization dashboards are displaying correct information.
4. Alarm Management
Review and test alarm triggers for proper functionality.
Ensure alarm logs are being recorded and accessible.
Confirm procedures for responding to alarms are documented.
5. Performance Analysis
Set up key performance indicators (KPIs) within the SCADA system.
Regularly analyze performance data for efficiency metrics.
Document any anomalies and performance issues for further review.
6. Maintenance Procedures
Establish a schedule for routine SCADA system maintenance.
Document and track any updates or changes to the system.
Ensure backup procedures are in place for data and configurations.
7. Training and Documentation
Provide training sessions for operators and maintenance personnel.
Ensure all SCADA operational manuals are up to date and accessible.
Document troubleshooting procedures for common issues.
8. Compliance and Security
Verify compliance with relevant regulations and standards.
Implement cybersecurity measures to protect the SCADA system.
Regularly review and update security protocols and access controls.
Download CSV
Download JSON
Download Markdown
Use in Manifestly