Column wall slab concrete post pour checking

Pre-Pour Checklist

Pour Day Checklist

During Pour Checklist

  • Position yourself for a clear view of the pour.
  • Observe the flow rate and adjust as necessary.
  • Ensure consistent coverage across all areas.
  • Check for any pooling or uneven spots.
  • Communicate with the team for immediate adjustments.
  • Use a concrete vibrator as specified.
  • Insert the vibrator vertically into the mix.
  • Vibrate for the recommended time without over-vibrating.
  • Watch for bubbles escaping to confirm air pocket removal.
  • Move the vibrator systematically to cover entire area.
  • Look for separation of aggregates from the mix.
  • Check for excessive water puddling on the surface.
  • Notify the team if segregation is observed.
  • Take samples if necessary for quality control.
  • Document findings for reporting purposes.
  • Refer to design specifications for layer thickness.
  • Communicate layer requirements to the pouring team.
  • Ensure each layer is properly compacted before adding the next.
  • Monitor the time between layers to prevent cold joints.
  • Confirm completion of each layer before proceeding.
  • Stay alert for equipment malfunctions or interruptions.
  • Check weather conditions frequently during the pour.
  • Have contingency plans ready for adverse weather.
  • Communicate issues immediately to the project manager.
  • Document any unforeseen challenges for future reference.

Post-Pour Checklist

  • Verify mix design matches project specifications.
  • Check volume of concrete delivered against calculations.
  • Ensure proper placement techniques were followed.
  • Confirm all required materials were utilized during pouring.
  • Look for cracks, honeycombing, or surface voids.
  • Check for proper finishing and leveling.
  • Ensure there are no foreign materials present.
  • Document any observed imperfections for further action.
  • Apply curing compound or cover with wet burlap.
  • Verify that temperature and humidity conditions are suitable.
  • Monitor curing effectiveness based on environmental conditions.
  • Establish a curing duration based on project specifications.
  • Record the exact date and time of the pour.
  • Note weather conditions at the time of pouring.
  • List personnel present during the pour.
  • Include any deviations from the planned procedure.
  • Identify required testing based on project specifications.
  • Coordinate with testing agencies for scheduled visits.
  • Prepare necessary documentation for testing procedures.
  • Ensure all required samples are collected and labeled.

Final Review Checklist