Commissioning Checklist for Building Management System

General Information

  • Enter the official name of the project.
  • Ensure it matches all documentation.
  • Use consistent naming conventions throughout.
  • Specify the complete address of the project.
  • Include city, state, and zip code.
  • Add any relevant geographical identifiers.
  • Record the date of commissioning activities.
  • Use the format: MM/DD/YYYY.
  • Ensure the date is current and accurate.
  • Identify the individual or organization overseeing commissioning.
  • Include contact information: phone and email.
  • Confirm their certification and role in the project.
  • Provide the name of the building owner or client.
  • Include contact details for communication.
  • Verify ownership and client agreements are in place.

Pre-Commissioning Checks

  • Collect all relevant documents.
  • Check for installation manuals, warranties, and compliance certificates.
  • Ensure documents are signed and dated by responsible parties.
  • Verify that all necessary inspections and approvals are documented.
  • Cross-reference installed equipment with specifications.
  • Check model numbers, sizes, and quantities.
  • Ensure proper placement according to design layout.
  • Verify that manufacturer installation guidelines are followed.
  • Inspect for physical damage or defects.
  • Check for correct labeling and identification.
  • Ensure all components are clean and free of debris.
  • Verify that components are properly mounted and secured.
  • Check power sources and ensure they are active.
  • Verify voltage and current ratings are within specifications.
  • Test each device for power connectivity.
  • Inspect circuit breakers and fuses for proper operation.
  • Inspect all wiring for damage or wear.
  • Ensure all connections are tight and free of corrosion.
  • Test continuity of wires using a multimeter.
  • Label wires clearly for future reference.

Functional Testing

  • Ensure sensors are powered and connected.
  • Simulate environmental conditions to verify readings.
  • Check for accurate data transmission to the BMS.
  • Inspect sensor placement and alignment.
  • Record and compare readings against expected values.
  • Test each actuator for manual operation.
  • Check control valve responses to BMS commands.
  • Ensure proper calibration of actuators and valves.
  • Monitor feedback signals for accuracy.
  • Document any discrepancies for troubleshooting.
  • Monitor temperature and humidity levels.
  • Verify system response to BMS commands.
  • Check for energy efficiency and airflow rates.
  • Inspect ductwork and vents for obstructions.
  • Document performance metrics for analysis.
  • Ensure all lighting fixtures are operational.
  • Test manual and automated control scenarios.
  • Verify occupancy sensors trigger lighting appropriately.
  • Check for scenes and schedules programmed in BMS.
  • Document any integration issues for resolution.
  • Test alarms for audible and visual alerts.
  • Verify notification delivery to intended recipients.
  • Check integration with emergency systems.
  • Simulate alarm conditions to ensure triggers work.
  • Document response times and effectiveness.

Software and Programming Verification

Calibration and Adjustments

  • Check manufacturer's specifications for each sensor.
  • Use calibration tools to verify accuracy.
  • Adjust readings to match standard reference values.
  • Document calibration results for each device.
  • Repeat calibration for devices as necessary.
  • Review current control settings and performance metrics.
  • Modify PID settings to eliminate oscillations.
  • Test adjustments under various load conditions.
  • Monitor system response to changes.
  • Document final parameter settings.
  • Verify setpoints against project specifications.
  • Check for consistency across related systems.
  • Adjust setpoints as required for comfort levels.
  • Test system response to setpoint changes.
  • Record any discrepancies and adjustments made.
  • Review schedule settings for accuracy.
  • Confirm correct time zones and daylight savings configurations.
  • Simulate schedule activation to test functionality.
  • Adjust schedules based on operational needs.
  • Document final schedule settings for reference.
  • Test demand control strategies under various conditions.
  • Verify communication between sensors and controllers.
  • Monitor energy consumption during testing.
  • Adjust strategies for improved efficiency if necessary.
  • Record outcomes of validation tests.

Documentation and Training

Final Review and Acceptance

Related Checklists