COMMISSIONING
Pre-Commissioning Activities
Review project scope and specifications
Develop a commissioning plan
Identify commissioning team members
Conduct a kick-off meeting
Verify equipment has been installed correctly
Perform equipment inspections
Conduct equipment start-up procedures
Verify proper calibration of instruments
Conduct system checks to ensure proper functioning
Perform system pressure tests
Conduct functional checks of control systems
Verify proper electrical connections
Ensure proper labeling of equipment and systems
Perform system flushing and cleaning procedures
Design Review
Review design documents for compliance with project requirements
Gather all relevant design documents.
Check against project requirements and specifications.
Highlight sections that do not meet requirements.
Prepare a summary of compliance findings.
Discuss findings with the team.
Identify any discrepancies or issues
Perform a detailed comparison of documents.
List all discrepancies clearly.
Prioritize issues based on impact.
Collaborate with team members for insights.
Document findings for review.
Coordinate with design team for revisions
Schedule a meeting with the design team.
Present identified discrepancies and issues.
Discuss potential solutions and revisions.
Assign tasks for making changes.
Set deadlines for revisions.
Verify that all design changes have been properly documented
Review change logs and documentation.
Ensure all changes are recorded accurately.
Check that approvals are in place for changes.
Confirm documentation is accessible to all stakeholders.
Organize documents for easy retrieval.
Confirm that all design calculations and specifications are accurate and up to date
Review all calculations against original specifications.
Cross-check with industry standards.
Update any outdated information.
Document and justify any changes made.
Share findings with relevant stakeholders.
Review design drawings and plans for accuracy and completeness
Check all drawings against design specifications.
Ensure all necessary views and details are included.
Identify missing elements or inconsistencies.
Coordinate with drafters for corrections.
Maintain a checklist for completeness.
Ensure that all design documents are properly filed and organized for future reference
Create a filing system for documents.
Categorize documents by project phase.
Establish naming conventions for files.
Ensure digital copies are backed up.
Review organization regularly for efficiency.
Conduct a thorough review of the design process to identify any potential areas for improvement
Gather feedback from all team members.
Analyze the design process step by step.
Identify bottlenecks or common issues.
Develop recommendations for improvements.
Document findings and share with the team.
Equipment Installation
Verify proper installation of equipment
Conduct pre-start checks
Ensure all equipment is operational
Functional Testing
Perform functional tests on equipment and systems
Verify proper operation and performance
Document test results
Conduct performance testing under various operating conditions
Verify compliance with design specifications
Identify and resolve any issues or deviations from expected performance
Conduct functional testing with integrated systems to ensure seamless operation
Perform reliability testing to ensure consistent performance over time
Conduct stress testing to evaluate the system's limits and capabilities
Verify compatibility with other systems and equipment
Conduct interoperability testing with other systems to ensure seamless communication and operation
System Integration
Coordinate integration of systems
Ensure proper communication between systems
Test integrated systems for functionality
Training
Provide training to operations and maintenance staff
Ensure staff are familiar with equipment and systems
Document training sessions
Documentation
Compile all commissioning documentation
Organize and review documentation for completeness
Submit final documentation to project team
Final Acceptance
Conduct final walk-through of systems
Verify all systems are operating as designed
Obtain sign-off from project team for final acceptance.