concrete foundation

Site Preparation

Formwork Installation

Reinforcement Placement

  • Review structural drawings for dimensions.
  • Use appropriate rebar cutting tools.
  • Follow spacing and overlap requirements.
  • Ensure rebar is placed at correct elevations.
  • Check for any obstructions before placement.
  • Use wire ties or rebar clips to secure intersections.
  • Ensure ties are twisted tightly to hold rebar firmly.
  • Check that rebar is positioned accurately before securing.
  • Inspect secured rebar for stability.
  • Avoid excessive force that may misalign rebar.
  • Schedule a review meeting with the engineer.
  • Provide structural drawings and rebar layout.
  • Address any discrepancies in placement or specifications.
  • Obtain written confirmation of compliance.
  • Document any changes made during verification.

Concrete Pouring

Finishing

Curing

Inspection and Quality Control

Form Removal

Final Site Cleanup

Documentation and Reporting

Related Checklists