CONCRETE WORK

PREPARATION AND PLANNING

SITE PREPARATION

MATERIALS AND EQUIPMENT

INSTALLATION

  • Verify mix design and quantity.
  • Prepare forms and reinforcement.
  • Ensure subgrade is level and compacted.
  • Begin pouring at the furthest point from the exit.
  • Use a chute or pump for controlled flow.
  • Insert vibrator vertically into the mix.
  • Avoid over-vibration to prevent segregation.
  • Consolidate around edges and corners thoroughly.
  • Move vibrator slowly through the concrete.
  • Use a mechanical vibrator for large pours.
  • Check ambient temperature and humidity.
  • Use thermal blankets if necessary.
  • Avoid pouring in extreme heat or cold.
  • Monitor for rain or wind during placement.
  • Document weather conditions for records.
  • Use a float to level the surface.
  • Apply a trowel for a smooth finish.
  • Consider joint placement for expansion and contraction.
  • Use curing compounds to retain moisture.
  • Finish edges carefully to prevent chipping.

CURING AND PROTECTION

  • Use wet burlap or cotton mats
  • Apply curing compounds that seal moisture
  • Mist concrete surfaces regularly with water
  • Cover with plastic sheeting to prevent evaporation
  • Maintain curing for at least 7 days for optimal strength
  • Erect windbreaks to shield from strong winds
  • Use tarps or covers during rain or snow
  • Ensure shade for high-temperature days
  • Monitor ambient temperature and adjust protection as necessary
  • Avoid direct sunlight to minimize rapid drying
  • Wait at least 24-48 hours after pouring
  • Check for initial set before removal
  • Use a pry bar gently to loosen forms
  • Remove forms in cooler, less humid conditions
  • Inspect for any signs of damage during removal

QUALITY CONTROL AND INSPECTION

  • Perform slump tests immediately after mixing.
  • Prepare cylinder samples in accordance with ASTM standards.
  • Label and date all samples accurately.
  • Store samples in a controlled environment.
  • Test cylinders at specified curing times.
  • Examine surfaces for cracks, spalling, and voids.
  • Check for proper finishing techniques.
  • Assess uniformity of color and texture.
  • Document any defects with clear photographs.
  • Notify the contractor of any issues immediately.
  • Review project specifications thoroughly.
  • Verify material certifications and compliance documents.
  • Cross-check work against relevant codes and standards.
  • Conduct periodic audits of construction practices.
  • Engage third-party inspectors if necessary.
  • Create a detailed inspection report for each activity.
  • Include date, time, and personnel involved.
  • Maintain a centralized log of all inspections.
  • Store documents digitally and physically for ease of access.
  • Review documentation for accuracy and completeness.

FINALIZATION