CONDENSER ERECTION

CONTRACTOR PREPARATION

SITE PREPARATION

EQUIPMENT PREPARATION

ERECTION PROCEDURES

ALIGNMENT AND LEVELING

CONNECTIVITY

FINAL INSPECTION

COMMISSIONING

  • Power up the system.
  • Check for any alarms or faults.
  • Test all operational modes and controls.
  • Ensure all components respond correctly.
  • Record results for reference.
  • Observe system parameters continuously.
  • Identify unusual noises or vibrations.
  • Check for leaks or unusual smells.
  • Document any irregularities for analysis.
  • Adjust parameters as necessary.
  • Schedule training sessions with staff.
  • Cover operational procedures and safety measures.
  • Provide hands-on demonstrations.
  • Distribute equipment manuals and troubleshooting guides.
  • Assess staff understanding through questions.
  • Compile all operational and maintenance manuals.
  • Include testing and commissioning reports.
  • Ensure all safety certifications are attached.
  • Schedule a handover meeting with the client.
  • Obtain client sign-off on documentation.
  • Test each safety interlock individually.
  • Simulate emergency conditions to check shutdowns.
  • Confirm visual and audible alarms function.
  • Document test results for each component.
  • Ensure compliance with safety regulations.
  • Use gauges to measure system pressure.
  • Check refrigerant levels against specifications.
  • Adjust charging as necessary to meet design criteria.
  • Look for signs of refrigerant leaks.
  • Document pressure readings for verification.
  • Attach vibration sensors to critical components.
  • Record baseline vibration data during operation.
  • Analyze data for abnormal patterns.
  • Compare results to industry standards.
  • Make adjustments if vibration levels exceed limits.
  • Run the system under normal operating conditions.
  • Measure output against design expectations.
  • Evaluate energy consumption and efficiency ratios.
  • Document findings for further analysis.
  • Make recommendations for any necessary adjustments.
  • Check all wiring for proper connections.
  • Test circuit continuity using a multimeter.
  • Look for signs of wear or damage.
  • Ensure grounding is adequate.
  • Document any findings for corrective action.
  • Review control parameters against design settings.
  • Test control system responsiveness.
  • Adjust settings for optimal operation.
  • Ensure software updates are applied.
  • Document final control settings.
  • Use calibration tools to check accuracy.
  • Compare sensor readings to known standards.
  • Adjust sensors as required to ensure precision.
  • Document calibration results for each device.
  • Schedule regular calibration checks.
  • Measure airflow at various points in the system.
  • Check temperature differentials across components.
  • Adjust dampers and vents as necessary.
  • Document airflow and temperature readings.
  • Ensure compliance with design specifications.
  • Cross-reference installation with manufacturer's guidelines.
  • Check alignment and positioning of equipment.
  • Verify all components are installed as specified.
  • Document any deviations and corrective actions.
  • Ensure compliance with industry standards.
  • Identify key maintenance milestones.
  • Set dates for follow-up inspections.
  • Communicate maintenance plan with contractor.
  • Document all scheduled checks.
  • Ensure contractor confirms availability.