Create a detailed construction checklist covering planning, site prep, foundation, framing, MEP inst

Planning Phase

Site Preparation

Foundation

Framing

MEP Installation (Mechanical, Electrical, Plumbing)

  • Gather project requirements and codes.
  • Design system layouts with accuracy.
  • Specify materials and equipment needed.
  • Include detailed diagrams and schematics.
  • Review plans with stakeholders for approval.
  • Lay out and mark plumbing lines.
  • Cut and assemble pipes according to plans.
  • Install fixtures such as sinks and toilets.
  • Connect drainage systems to municipal lines.
  • Test for leaks and ensure proper flow.
  • Install ductwork according to design specifications.
  • Mount HVAC units securely in designated locations.
  • Connect power and control wiring to systems.
  • Seal duct joints to prevent air leakage.
  • Test system for proper airflow and operation.
  • Run electrical conduits and cables as per plans.
  • Install outlets, switches, and fixtures securely.
  • Connect wiring to the main electrical panel.
  • Ensure grounding and circuit protection are in place.
  • Test all installations for functionality and safety.
  • Coordinate inspections with local authorities.
  • Check compliance with building codes.
  • Verify installations match approved plans.
  • Document any issues and corrective actions.
  • Ensure all safety protocols are followed.
  • Perform functional tests on all systems.
  • Check for leaks in plumbing and HVAC.
  • Test electrical systems for voltage and continuity.
  • Confirm all systems meet performance standards.
  • Prepare a report of testing results for records.

Final Inspection and Punch List