1. Pre-Installation Checks

2. Safety Protocols

3. Meter Installation Procedure

  • Locate the main power supply switch.
  • Ensure the switch is in the 'off' position.
  • Use a multimeter to verify no voltage at the installation site.
  • Wear appropriate personal protective equipment.
  • Remove any debris or dust from the area.
  • Clear space around the installation site for easy access.
  • Check for any tools or materials that may obstruct the work.
  • Confirm that the area meets safety regulations.
  • Inspect the surface for structural integrity.
  • Ensure the surface is dry and free from corrosion.
  • Check that the surface material is compatible with the meter.
  • Confirm that the mounting height is according to guidelines.
  • Use a level tool to check horizontal alignment.
  • Adjust the meter position until it is level.
  • Ensure the meter face is easily readable.
  • Double-check alignment before securing the meter.
  • Refer to the provided wiring diagram.
  • Connect wires securely using appropriate connectors.
  • Double-check polarity and connection points.
  • Ensure all connections are tight to prevent future issues.
  • Inspect seals for any damage or wear.
  • Apply weatherproofing material as specified.
  • Ensure all entry points for wires are sealed.
  • Verify that the meter enclosure is properly closed.

4. Post-Installation Checks

5. Final Documentation

6. Follow-Up Actions