critical lifting
Pre-Lift Planning
Identify the load and its weight.
Determine the lifting method and equipment required.
Conduct a risk assessment for the lift.
Obtain necessary permits and approvals.
Develop a lift plan outlining all steps and responsibilities.
Here are some additional steps that could be included in the Pre-Lift Planning section of a critical lifting checklist
Review site layout and access routes for lifting equipment and the load
Assess environmental conditions (e.g., weather, wind speed, temperature) that may impact the lift
Identify any potential obstacles or hazards in the lift area (e.g., overhead power lines, nearby structures)
Coordinate with all involved personnel and stakeholders, ensuring everyone is informed of the plan
Establish communication protocols for the lift, including hand signals or radio communication
Determine the need for specialized personnel (e.g., riggers, signalers) and ensure they are available
Plan for emergency procedures in case of an incident during the lift
Verify the availability and condition of necessary lifting accessories (e.g., slings, shackles, hooks)
Conduct a simulation or rehearsal of the lift if possible, especially for complex or high-risk operations
Ensure all personnel involved in the lift are trained and qualified for their specific roles
Equipment Inspection
Inspect lifting equipment (cranes, hoists, slings, etc.) for defects.
Verify that all lifting equipment is certified and maintained.
Check load rigging and attachments for integrity.
Ensure safety devices (e.g., limit switches, emergency stops) are functional.
Personnel Preparation
Verify that all personnel involved are trained and qualified.
Assign roles and responsibilities for the lift.
Conduct a pre-lift briefing to communicate the lift plan.
Ensure that a qualified signal person is designated for the lift.
Site Inspection
Assess the lift site for hazards (overhead lines, ground stability, etc.).
Ensure the area is clear of unauthorized personnel.
Confirm that the ground conditions are suitable for the lift equipment.
Identify and address potential weather-related issues.
Execution of the Lift
Follow the lift plan step-by-step.
Use hand signals and communication protocols consistently.
Monitor the load and equipment throughout the lift.
Be prepared to abort the lift if safety is compromised.
Here are some additional steps that could be included in the "Execution of the Lift" section of the critical lifting checklist
Ensure all personnel are in designated safe zones before initiating the lift
Confirm that the load is properly rigged and secured before lifting
Gradually raise the load to inspect for any unusual movements or sounds
Maintain constant visual contact with the load and follow designated communication protocols
Assess and manage any environmental factors that could affect the lift, such as wind or obstructions
Communicate any changes in conditions or concerns immediately to the lift supervisor
Monitor the stability of the load throughout the lift, adjusting as necessary
Conduct regular checks of the lifting equipment's performance during the lift
Ensure that all personnel involved in the lift remain focused and attentive
Document any incidents or deviations from the lift plan during execution for post-lift review
Post-Lift Procedures
Lower the load safely to the designated location.
Inspect equipment after the lift for any damage or wear.
Complete any required documentation of the lift.
Conduct a debriefing to discuss the lift and any lessons learned.