commissioning checklist
Pre-Commissioning Activities
Verify all design documents are complete and accurate
Conduct a pre-functional inspection of equipment
Verify all necessary permits and approvals are in place
Functional Testing
Test each piece of equipment individually
Test integrated systems
Verify control sequences are operating correctly
Controls Verification
Verify all sensors and actuators are calibrated correctly
Confirm communication between all control devices
Verify trend data is being recorded accurately
Performance Testing
Conduct load testing on equipment
Verify energy efficiency of systems
Verify that all safety systems are functioning properly
Documentation
Compile all test results and documentation
Create operations and maintenance manuals
Provide training to operations staff
Final Commissioning
Conduct final walkthrough with owner
Obtain sign-off on all tests and documentation
Hand over control of systems to operations staff