solar site survey checklist
Design Phase
Obtain electric bill to determine total KWH used in a month and over 12 months
Design system to produce the required amount of KWH used per year
Site Survey
Sales rep to conduct site survey
Take pictures of 200 amp service panel
Take up-close and wide-angle photos of electric meter
Take pictures of potential wall for battery, switch, and generator installation
Engineers to use survey information for plans set, typically 7-21 days for approval
Permitting and Approvals
Submit plans to city for permits and approvals
Await approval, typically takes 7-21 days
Schedule installation once permits are approved
Installation
Installation scheduled, takes 1-2 days to complete
Schedule video inspection with city inspectors post-installation
Final Inspection
Schedule final site inspection for city inspection
Net Metering Setup
Receive email from OG&E Power Clerk for net metering setup
Schedule appointment for new electrical meter replacement, typically 21-30 days
This checklist outlines the steps from the design phase to the final net metering setup for a solar installation project.