DG Wet scrubber Commissioning checklist
Pre-Commissioning Activities
Ensure all equipment is installed as per design specifications
Verify all piping connections are secure and leak-free
Conduct a visual inspection of the wet scrubber for any damage or defects
Ensure all control instruments are properly calibrated
Electrical System Checks
Verify all electrical connections are secure and properly grounded
Test the interlocks and safety systems to ensure they are functioning correctly
Verify that all motors and fans are operating within specified parameters
Conduct a power supply test to ensure consistent and stable power
Water System Checks
Verify all water supply connections are secure and leak-free
Test the water pump to ensure it is providing sufficient flow
Check the water level in the scrubber to ensure it is within the recommended range
Conduct a water quality test to ensure it meets the required standards
Airflow System Checks
Verify all ductwork connections are secure and leak-free
Test the airflow rate to ensure it meets the design specifications
Check the pressure drop across the scrubber to ensure it is within acceptable limits
Conduct an air quality test to ensure the scrubber is effectively removing pollutants
Commissioning Tests
Conduct a performance test to verify the scrubber is achieving the required removal efficiency
Test the alarm systems to ensure they are functioning correctly
Verify the communication systems are operational and able to transmit data effectively
Conduct a final walkthrough inspection to ensure all systems are functioning as intended
Documentation and Training
Compile all commissioning test results and documentation for future reference
Provide training to operational staff on the proper use and maintenance of the wet scrubber
Review the commissioning checklist to ensure all steps have been completed successfully
Ensure all relevant parties are informed of the successful commissioning of the wet scrubber.