DP FLOW TRANSMITTER
1. PRE-INSTALLATION CHECKS
Verify the specifications of the DP flow transmitter against system requirements.
Ensure all necessary tools and materials are available for installation.
Check the calibration certificate of the DP flow transmitter.
2. INSTALLATION PROCEDURE
Ensure the installation site is clean and free from debris.
Mount the DP flow transmitter according to the manufacturer's guidelines.
Confirm the correct orientation of the transmitter (horizontal/vertical).
Secure all connections to prevent leaks.
3. WIRING AND CONNECTIONS
Verify electrical requirements and ensure compatibility with the transmitter.
Connect power supply and signal wires as per the wiring diagram.
Ensure all connections are tight and insulated appropriately.
4. INITIAL SETUP
Power on the DP flow transmitter and check for any error indications.
Configure the transmitter settings as per process requirements.
Perform a zero and span calibration to ensure accuracy.
5. FUNCTIONAL TESTING
Conduct a flow test to verify transmitter response.
Compare the readings with a calibrated reference to ensure accuracy.
Check for any abnormal noise or vibration during operation.
6. FINALIZATION
Document all installation and calibration details.
Provide training to personnel on operating the DP flow transmitter.
Ensure all safety and operational procedures are reviewed.
7. MAINTENANCE
Schedule regular maintenance checks according to manufacturer recommendations.
Inspect for leaks, wear, and damage periodically.
Keep calibration records up to date for future reference.