DTR meter removal and installation safety checklist

1. Preparation Before Removal

2. Personal Protective Equipment (PPE)

3. Power Shutdown Procedures

4. Meter Removal Process

5. Inspection of the Installation Site

6. Meter Installation Process

7. Power Restoration Procedures

8. Post-Installation Checks

9. Clean-Up and Disposal