DTR meter removal and installation safety checklist
1. Preparation Before Removal
Ensure all necessary tools and equipment are available.
Review the DTR meter installation manual and safety guidelines.
Notify relevant personnel about the planned removal and installation.
Confirm that the work area is clear and safe for operation.
2. Personal Protective Equipment (PPE)
Wear appropriate gloves to protect hands.
Use safety goggles to protect eyes from potential hazards.
Ensure hard hats are worn if working in areas with overhead risks.
Use insulated footwear to prevent electrical shock.
3. Power Shutdown Procedures
Verify that the power supply to the DTR meter is turned off.
Use a lockout/tagout (LOTO) system to ensure power remains off during work.
Test the circuit with a voltage tester to confirm it is de-energized.
4. Meter Removal Process
Carefully disconnect any wiring from the DTR meter.
Remove any mounting hardware securing the meter in place.
Handle the meter with care to avoid damage or injury.
5. Inspection of the Installation Site
Inspect the mounting location for any signs of damage or corrosion.
Ensure that all connections and fittings are clean and in good condition.
Verify that the installation area meets all safety and operational standards.
6. Meter Installation Process
Position the new DTR meter in the designated location.
Secure the meter using appropriate mounting hardware.
Reconnect wiring according to the installation manual and electrical codes.
7. Power Restoration Procedures
Double-check all connections and ensure they are secure.
Remove any lockout/tagout devices safely.
Restore power to the DTR meter and monitor for proper operation.
8. Post-Installation Checks
Conduct a thorough inspection of the installation for any issues.
Test the DTR meter to confirm functionality and accuracy.
Document the installation and any observations or issues encountered.
9. Clean-Up and Disposal
Dispose of any old meters or materials according to local regulations.
Clean the work area and remove all tools and equipment.
Report any safety incidents or near misses to the appropriate personnel.