DV Software Feature Complete Design Review

1. Preliminary Preparation

  • Gather all relevant project documents.
  • Analyze requirements for completeness and clarity.
  • Identify any discrepancies or ambiguities.
  • Prepare a summary of key points for discussion.
  • Check version history of all documents.
  • Verify that all required approvals are obtained.
  • Ensure that any changes are logged and communicated.
  • Compile documents into a single accessible location.
  • Identify key individuals based on expertise.
  • Invite team members with relevant backgrounds.
  • Confirm availability and commitment to attend.
  • Share the participant list with all invitees.
  • Select a date and time that accommodates all participants.
  • Draft a clear and concise agenda outlining topics.
  • Send calendar invites to all attendees.
  • Include any pre-meeting materials with the agenda.

2. Design Documentation Review

  • Assess document structure and organization.
  • Confirm inclusion of all necessary sections and details.
  • Evaluate clarity of language and terminology used.
  • Check for visual aids like diagrams and charts.
  • Inspect decision logs for completeness.
  • Ensure justifications are clearly stated and rational.
  • Cross-reference decisions with relevant requirements or constraints.
  • Look for stakeholder approvals on critical decisions.
  • Review project requirements documentation.
  • Verify compliance with industry standards and regulations.
  • Identify any gaps between design and requirements.
  • Ensure traceability between requirements and design elements.
  • Map out all interfaces and their specifications.
  • Evaluate data flow and interaction protocols.
  • Ensure compatibility with external systems.
  • Document any assumptions about interactions.

3. Functional Requirements Verification

  • Review the functional requirements document.
  • Cross-check each requirement against design specifications.
  • Identify any missing requirements or design components.
  • Document findings and communicate with the design team.
  • Create a traceability matrix mapping requirements to design.
  • Ensure each requirement has corresponding design elements.
  • Identify any gaps in traceability.
  • Review with stakeholders for validation.
  • Review implementation plans against functional requirements.
  • Check for detailed steps and timelines.
  • Identify any incomplete or unclear plans.
  • Discuss with the development team for clarifications.

4. Non-Functional Requirements Assessment

  • Identify key non-functional requirements.
  • Check design documentation for alignment with requirements.
  • Evaluate performance metrics and security protocols.
  • Ensure usability standards meet industry benchmarks.
  • Document any discrepancies and suggested improvements.
  • Evaluate system architecture for scalability.
  • Identify potential bottlenecks and their solutions.
  • Review code structure for maintainability.
  • Assess documentation quality for future updates.
  • Suggest enhancements for improved scalability.
  • Document all trade-offs identified in design.
  • Evaluate the impact of trade-offs on system performance.
  • Assess risks associated with trade-offs.
  • Gather feedback from stakeholders on trade-offs.
  • Provide recommendations for mitigating negative impacts.

5. Risk Management Review

  • Conduct brainstorming sessions with the team.
  • Utilize checklists from previous projects.
  • Consider technical, operational, and financial risks.
  • Document all identified risks in a risk register.
  • Assess the effectiveness of current strategies.
  • Engage with stakeholders for input on revisions.
  • Prioritize strategies based on risk severity.
  • Update the risk register with mitigation details.
  • Identify high-risk areas based on analysis.
  • Develop actionable contingency plans.
  • Assign responsibilities for executing plans.
  • Test contingency plans through simulations or drills.

6. Testing and Validation Strategies

  • Identify testing types (unit, integration, system).
  • Assess alignment with feature specifications.
  • Ensure inclusion of edge cases.
  • Determine resource allocation for testing.
  • Review timelines for testing execution.
  • Match validation methods with documented requirements.
  • Ensure traceability between requirements and tests.
  • Review criteria for successful validation.
  • Identify any gaps or overlaps in validation methods.
  • Document any discrepancies and propose resolutions.
  • Verify test case completeness against requirements.
  • Assess coverage of all feature functionalities.
  • Ensure clarity and reproducibility of test cases.
  • Review prioritization of test cases based on risk.
  • Confirm documentation of test execution results.

7. Feedback and Discussion

  • Create a welcoming environment for sharing opinions.
  • Set a specific time limit for discussion.
  • Encourage everyone to speak by prompting quieter members.
  • Use open-ended questions to stimulate conversation.
  • Designate a scribe to record feedback accurately.
  • Use a shared document for transparency.
  • Categorize concerns by priority and impact.
  • Review documented concerns at the end of the session.
  • Frame feedback as opportunities for growth.
  • Request specific examples to clarify points.
  • Acknowledge valid concerns and discuss potential solutions.
  • Foster a mindset of collaboration and support.

8. Action Items and Follow-Up

  • Review all feedback thoroughly.
  • Categorize feedback into actionable items.
  • Determine responsible team members for each item.
  • Document assignments clearly for tracking.
  • Identify realistic timelines for each action item.
  • Consult with team members for availability.
  • Use a shared calendar tool for scheduling.
  • Send calendar invites for follow-up meetings.
  • Draft a summary of assigned tasks.
  • Distribute the summary to all team members.
  • Encourage questions for clarity.
  • Confirm that all members understand their roles.

9. Review Closure

  • Compile notes and feedback from the review session.
  • Highlight critical issues and resolutions.
  • Document any changes agreed upon during the meeting.
  • Prepare a summary report for distribution.
  • Identify all relevant stakeholders for approval.
  • Distribute the summary report to stakeholders.
  • Request formal sign-off via email or a designated platform.
  • Confirm receipt of approvals and document them.
  • Organize all related documents in a designated folder.
  • Ensure all digital files are properly labeled and versioned.
  • Create a backup of all materials in a secure location.
  • Establish a process for future retrieval of archived materials.

10. Continuous Improvement

  • Conduct a debriefing session with team members.
  • Document key takeaways and insights.
  • Encourage open discussion about successes and challenges.
  • Collect individual feedback through surveys or interviews.
  • Analyze feedback from the lessons learned.
  • Pinpoint recurring issues or bottlenecks.
  • Rank areas based on impact and feasibility.
  • Collaborate with stakeholders to prioritize improvements.
  • Review existing checklist for relevance and completeness.
  • Incorporate new insights and best practices.
  • Ensure updates are communicated to all team members.
  • Establish a timeline for implementing changes.

Related Checklists