electrical commision check list

1. Pre-Commissioning Activities

  • Gather all relevant documentation.
  • Check for specifications on equipment and materials.
  • Ensure compliance with local codes and regulations.
  • Identify any discrepancies or missing information.
  • Prepare questions for clarification with design engineers.
  • Conduct a physical inventory of items.
  • Check manufacturer specifications against project requirements.
  • Inspect for damage or defects.
  • Ensure proper storage conditions are maintained.
  • Document any discrepancies or issues.
  • Inspect overall site conditions and access.
  • Identify potential hazards and safety concerns.
  • Check for proper signage and safety equipment.
  • Review emergency exit routes and procedures.
  • Engage with site personnel for feedback.
  • Verify that all permits are current and valid.
  • Collect copies of all relevant approvals.
  • Confirm compliance with local regulations.
  • Document any pending applications.
  • Communicate with local authorities if needed.
  • Inspect labels on all components.
  • Ensure conformity with labeling standards.
  • Check for legibility and visibility.
  • Document any missing or incorrect labels.
  • Coordinate with installation team for corrections.
  • Review installation against design drawings.
  • Check for proper fastening and support.
  • Verify adherence to clearance requirements.
  • Inspect connections for tightness and security.
  • Document any deviations for follow-up.
  • Conduct continuity tests on grounding conductors.
  • Inspect connections for corrosion or damage.
  • Verify bonding of all metallic components.
  • Document test results and any required repairs.
  • Ensure compliance with grounding standards.
  • Check installation according to manufacturer instructions.
  • Inspect ratings against project requirements.
  • Verify operational status through testing.
  • Document any discrepancies or issues.
  • Ensure proper labeling of safety equipment.
  • Conduct a thorough cleaning of all equipment.
  • Inspect for foreign materials or debris.
  • Check for moisture accumulation.
  • Document the condition of equipment after cleaning.
  • Implement procedures for maintaining cleanliness.
  • Inspect protective devices for proper installation.
  • Conduct operational tests on devices.
  • Check for alignment with design specifications.
  • Document test results and any issues.
  • Ensure devices are properly labeled.
  • Measure voltage and current at supply points.
  • Verify power supply ratings against requirements.
  • Check for fluctuations or instability.
  • Document power quality assessments.
  • Coordinate with utility providers if necessary.
  • Review placement against design plans.
  • Conduct functionality tests on all devices.
  • Check for proper alignment and visibility.
  • Document any issues or required adjustments.
  • Ensure compliance with lighting standards.
  • Ensure procedures are documented and accessible.
  • Inspect postings for visibility and clarity.
  • Conduct a walkthrough of procedures with personnel.
  • Document any feedback or required updates.
  • Confirm understanding among all staff.
  • Compile a list of required tools and equipment.
  • Verify that all items are on-site and functional.
  • Check for calibration of measuring devices.
  • Document any missing items.
  • Arrange for procurement or rental of necessary tools.
  • Assess the safety plan against current regulations.
  • Identify any gaps or areas of improvement.
  • Document findings and proposed changes.
  • Ensure all personnel are trained on the safety plan.
  • Review emergency protocols with staff.
  • Verify qualifications and certifications of personnel.
  • Ensure adequate staffing levels for commissioning.
  • Document qualifications for all involved staff.
  • Arrange for additional training if necessary.
  • Conduct a briefing on roles and responsibilities.
  • Compile a list of required training sessions.
  • Verify attendance records for completed training.
  • Document any outstanding training needs.
  • Schedule follow-up sessions as needed.
  • Ensure training materials are accessible.

2. Visual Inspection

  • Look for cracks, dents, or other signs of damage on equipment surfaces.
  • Check for clear and legible labels on all equipment and components.
  • Ensure labels indicate voltage, phase, and other relevant information.
  • Confirm that safety warnings and instructions are visible.
  • Ensure wires are routed away from sharp edges and abrasive surfaces.
  • Confirm that wiring is secured with appropriate fasteners and supports.
  • Inspect for protective coverings or conduits in exposed areas.
  • Check for signs of wear or damage due to environmental exposure.
  • Inspect grounding rods, plates, and connections for integrity.
  • Ensure grounding conductors are properly sized and connected.
  • Confirm that grounding points are accessible for future testing.
  • Check documentation for compliance with local codes.
  • Verify that circuit breakers and fuses are rated for the application.
  • Check that all safety devices are properly mounted and accessible.
  • Ensure that the operation of safety equipment is not obstructed.
  • Confirm that labeling matches the function of the safety devices.
  • Check electrical connections using a torque wrench where applicable.
  • Inspect for any discoloration or corrosion on terminals and connectors.
  • Ensure that all connections are adequately protected from moisture.
  • Confirm that wire nuts and terminal blocks are secure.
  • Check that all doors and panels on electrical enclosures are closed.
  • Ensure that locking mechanisms function properly.
  • Inspect for any gaps or misalignments that could allow ingress.
  • Confirm that seals are intact to prevent dust or moisture entry.
  • Verify that access panels are in place and sealed correctly.
  • Ensure panels can be opened without obstruction.
  • Confirm that labels indicate the purpose of each access panel.
  • Check for any tools or equipment stored near access points.
  • Inspect for any wiring that is not properly insulated or covered.
  • Look for exposed electrical components that pose shock hazards.
  • Ensure that all junction boxes are properly covered.
  • Confirm that hazardous conditions are addressed and mitigated.
  • Check for any signs of fraying or cuts in wire insulation.
  • Inspect for discolored or melted insulation indicating overheating.
  • Ensure that insulation is appropriate for the environmental conditions.
  • Confirm that all wire insulation meets industry standards.
  • Verify that all panels have corresponding schedules nearby.
  • Check that all circuits are clearly labeled with their functions.
  • Ensure that labels are consistently formatted and easy to read.
  • Confirm that any changes are documented and updated.
  • Ensure there is adequate space for maintenance and operation.
  • Check that no items are stored or obstructing equipment.
  • Verify that clearance meets manufacturer specifications and codes.
  • Inspect for any trip hazards near electrical installations.
  • Inspect conduits for any blockages or debris inside.
  • Check that all conduit connections are tight and secure.
  • Ensure that raceways are sealed to prevent water ingress.
  • Confirm that conduits are properly supported and aligned.
  • Check that all vents are clear of dust and debris.
  • Ensure fans and blowers operate correctly and quietly.
  • Inspect for proper airflow direction and no blockages.
  • Confirm that temperature monitoring systems are operational.
  • Review installation plans against local electrical codes.
  • Check that all components meet required safety standards.
  • Ensure that permits and inspections are up to date.
  • Document any discrepancies for follow-up actions.

3. Functional Testing

  • Use a megohmmeter to measure insulation resistance.
  • Ensure readings meet minimum resistance values specified.
  • Test all cables and equipment individually.
  • Record results for each component.
  • Use a multimeter to check continuity across each circuit.
  • Ensure all connections are secure and functional.
  • Identify and rectify any open circuits.
  • Document results for future reference.
  • Simulate fault conditions to assess device response.
  • Check operation of fuses, circuit breakers, and relays.
  • Ensure devices trip or activate as designed.
  • Record the performance of each protective device.
  • Test all control system inputs and outputs.
  • Ensure all interlocks function correctly.
  • Simulate emergency conditions to verify responses.
  • Document any discrepancies or failures.
  • Apply load to the circuit as specified.
  • Monitor performance of circuit breakers and fuses.
  • Check trip settings and response times.
  • Record the operational data.
  • Use a voltmeter and ammeter to take readings.
  • Compare measurements with design specifications.
  • Identify any anomalies or issues.
  • Document all findings for compliance.
  • Test each emergency stop button for response.
  • Ensure all safety interlocks engage properly.
  • Simulate emergency scenarios to confirm functionality.
  • Record the results of each test.
  • Apply specified loads to the equipment.
  • Monitor performance for stability and efficiency.
  • Check for overheating or unusual noises.
  • Document results and any issues encountered.
  • Check all alarm systems for proper operation.
  • Verify visual and audible indicators function correctly.
  • Simulate fault conditions to test alarms.
  • Record operational status of all alarms.
  • Test each relay and timer for correct operation.
  • Check timing sequences and relay responses.
  • Identify any deviations from expected performance.
  • Document all results for review.
  • Test VFDs under various load conditions.
  • Monitor speed and torque outputs.
  • Check for overheating or abnormal behavior.
  • Record performance data for analysis.
  • Verify communication links between devices.
  • Test data transfer rates and accuracy.
  • Check for error messages or failures.
  • Document communication performance.
  • Use a thermal camera to scan electrical components.
  • Identify areas with excessive heat generation.
  • Assess thermal performance against specifications.
  • Document findings with images and notes.
  • Compile all test results in a formal report.
  • Compare results with initial design specifications.
  • Highlight any discrepancies or issues found.
  • Ensure all documentation is clear and accurate.

4. System Verification

5. Documentation and Reporting

6. Final Review and Handover

7. Post-Commissioning Follow-Up

  • Identify potential issues based on initial operation feedback.
  • Coordinate with relevant stakeholders to set a date.
  • Prepare necessary documentation and reports for review.
  • Ensure all systems are operational prior to the inspection.
  • Collect performance data regularly during the first weeks.
  • Identify any irregularities or performance dips.
  • Communicate findings with the engineering team.
  • Adjust operational parameters as necessary based on data.
  • Establish a support contact for immediate assistance.
  • Create a troubleshooting guide for common issues.
  • Schedule regular maintenance checks in advance.
  • Document all support interactions for future reference.
  • Gather feedback from team members involved in commissioning.
  • Analyze data collected during commissioning for trends.
  • Identify areas for improvement based on feedback and data.
  • Prepare a report outlining recommendations for future projects.