ELECTRICAL INSTALLATION SAFETY AUDIT CHECKLIST (For New Residential and Industrial Installations)..

GENERAL INFORMATION

  • Specify the official name of the project.
  • Ensure it matches any permits or legal documents.
  • Include any associated project identifiers.
  • Provide the full address of the installation site.
  • Include city, state, and ZIP code.
  • Note any specific area within a larger complex if applicable.
  • Record the date the audit is conducted.
  • Format as MM/DD/YYYY for consistency.
  • Verify the date against project timeline.
  • Write the full name of the auditor conducting the audit.
  • Include any relevant certifications or titles.
  • Ensure the name matches identification documents.
  • Provide a phone number for direct communication.
  • Include an email address for follow-up queries.
  • Ensure all information is current and accurately spelled.

DOCUMENTATION REVIEW

INSTALLATION INSPECTION

SAFETY DEVICES AND EQUIPMENT

WORKPLACE SAFETY

TESTING AND COMMISSIONING

FINAL REVIEW AND REPORT