> FACTORY ACCEPTENCE TEST
FACTORY ACCEPTENCE TEST
1. Preparation
Confirm test schedule with all stakeholders
Ensure all required documentation is available
Verify test equipment is calibrated and functional
Prepare test environment and setup
2. System Inspection
Check physical condition of the equipment
Verify installation according to specifications
Inspect all safety features and emergency stops
Ensure all components are installed and connected correctly
3. Functional Testing
Validate system start-up procedures
Test all operational modes and functions
Check control systems and interfaces
Verify communication between components and systems
4. Performance Testing
Measure system performance against specifications
Conduct load tests to assess capacity and response
Evaluate speed, accuracy, and reliability of operations
Record all performance data for analysis
5. Safety and Compliance Testing
Test all safety interlocks and emergency systems
Verify compliance with industry standards and regulations
Conduct risk assessments and hazard analysis
Ensure proper labeling and documentation for safety
6. Documentation and Reporting
Compile results from all tests conducted
Document any issues or discrepancies found
Prepare a final report summarizing test outcomes
Review and obtain sign-off from all stakeholders
7. Follow-Up Actions
Schedule any necessary repairs or adjustments
Plan for any additional testing if required
Set timelines for addressing identified issues
Confirm next steps for system delivery and installation