Fan coil unit
Pre-Installation Checks
Verify site conditions and accessibility.
Confirm installation location with project plans.
Inspect the fan coil unit for any visible damage.
Check compatibility with existing HVAC systems.
Here are some additional steps you could include in the Pre-Installation Checks section of the New Fan Coil Unit Checklist
Ensure that all necessary tools and equipment are available on-site
Verify the availability of electrical and plumbing connections as per specifications
Review manufacturer’s installation guidelines and specifications
Confirm that the unit size and capacity meet project requirements
Check for adequate clearance around the installation area for maintenance access
Inspect ductwork and piping for any obstructions or damage
Verify that the mounting hardware and supports are suitable for the fan coil unit
Ensure that the installation environment meets temperature and humidity specifications
Check local building codes and regulations for compliance
Confirm that all required permits and approvals have been obtained before installation
Installation Steps
Secure the mounting brackets to the designated location.
Connect the water supply and return lines.
Install the electrical connections as per the wiring diagram.
Ensure proper drainage setup for condensate.
Mount the fan coil unit securely to the brackets.
Post-Installation Checks
Test the water flow through the unit.
Check for leaks in water connections.
Ensure the electrical connections are secure and safe.
Calibrate the thermostat and control settings.
Here are some additional steps that could be included in the Post-Installation Checks section of a New Fan Coil Unit checklist
Verify the fan operation by running the unit at different speed settings
Inspect the air filter for proper installation and cleanliness
Confirm that air is being evenly distributed from the unit’s vents
Check the condensate drain for proper flow and ensure there are no blockages
Ensure that the unit is level and securely mounted
Inspect insulation on pipes for damage or missing sections
Test the system for noise levels and ensure they are within acceptable limits
Monitor the system for any unusual vibrations during operation
Check the system's response time to thermostat adjustments
Review the manufacturer's installation and operation manuals for compliance with local codes and standards
Operational Testing
Turn on the fan coil unit and observe its operation.
Verify airflow and temperature output.
Listen for any unusual noises during operation.
Check the operation of the condensate drain.
Here are some additional steps you could include in the Operational Testing section of the New Fan Coil Unit checklist
Measure and record the temperature differential between supply and return air
Test the control system by adjusting the thermostat settings and observing the response of the fan coil unit
Inspect the unit for any signs of refrigerant leaks or abnormal pressure readings (if applicable)
Confirm that the unit cycles on and off according to the thermostat settings
Monitor the electrical connections for proper voltage and current draw
Check for any signs of water pooling or leakage around the unit
Ensure that all safety features (like high limit switches) are functioning properly
Verify that the unit's filters are clean and properly installed
Observe the unit's operation in various modes (heating, cooling, fan only) to ensure all functions are working correctly
Document any irregularities or issues encountered during testing for follow-up
Maintenance Schedule
Establish a regular cleaning schedule for filters.
Inspect the fan and coils for dust accumulation.
Schedule annual professional inspections.
Document all maintenance activities and findings.