Your checklists (
0
)
AI Checklist Generator
From the makers of
Manifestly Checklists
Sign in
Email address
Email me a magic link
Home
> Fire pump weekly testing
Fire pump weekly testing
1. Preparation
Confirm testing schedule and ensure it aligns with regulations.
Gather necessary tools and equipment (e.g., gauge, stopwatch, data log).
Check that the area around the fire pump is clear of obstructions.
2. Safety Precautions
Wear appropriate personal protective equipment (PPE).
Ensure that all personnel are aware of the testing procedure.
Verify that emergency services are notified of the test, if necessary.
3. Visual Inspection
Inspect the fire pump for any visible leaks or damage.
Check the pump's alignment and mounting.
Ensure that the suction and discharge valves are operable and in the correct position.
4. Operational Testing
Start the fire pump according to the manufacturer’s instructions.
Monitor and record the pump pressure and flow rate.
Check the operation of any alarms or warning systems.
5. Performance Evaluation
Compare recorded data against manufacturer specifications.
Identify any discrepancies and take note of potential issues.
Evaluate the pump's ability to maintain pressure over the testing duration.
6. Post-Test Procedures
Shut down the fire pump safely and return it to standby mode.
Document all test results and observations in the maintenance log.
Communicate any issues identified during the test to the maintenance team.
7. Follow-Up Actions
Schedule any necessary repairs or maintenance based on test results.
Review and update testing procedures as needed to improve efficiency.
Ensure that all test documentation is filed appropriately for future reference.
Download CSV
Download JSON
Download Markdown
Use in Manifestly