flow switch
Pre-Installation Preparation
Verify that all necessary tools and materials are available.
Review the flow switch specifications and installation manual.
Ensure that the installation site is accessible and safe.
Check for any electrical or plumbing codes that need to be followed.
Electrical Connections
Turn off the power supply to the system.
Identify the correct wiring configuration for the flow switch.
Connect the wires according to the manufacturer's instructions.
Secure all connections and ensure there are no exposed wires.
Mechanical Installation
Choose an appropriate location for the flow switch installation.
Ensure the flow switch is oriented correctly (e.g., vertical or horizontal).
Install the flow switch using the appropriate mounting hardware.
Check for any obstructions that may affect flow.
System Integration
Reconnect any disconnected piping or plumbing.
Ensure that the flow switch is properly aligned with the flow direction.
Test the flow switch for proper operation.
Verify that the system is functioning correctly after installation.
Post-Installation Checks
Inspect for any leaks around the flow switch.
Confirm that all electrical connections are secure.
Document the installation for future reference.
Schedule a follow-up inspection to ensure continued operation.