high voltage transformer on-site testing

Preparation for Testing

Pre-Testing Inspection

  • Examine the transformer for any visible damage or corrosion.
  • Check for oil leaks or signs of contamination.
  • Ensure proper drainage around the area.
  • Inspect grounding connections and ensure they are secure.
  • Verify that the area is clear of debris and hazards.
  • Inspect terminals for signs of wear or overheating.
  • Ensure all connections are tight and secure.
  • Look for any signs of corrosion on fittings.
  • Verify insulation integrity on wires and cables.
  • Test for proper torque on all bolted connections.
  • Confirm the transformer model and serial number.
  • Check voltage and current ratings against project specifications.
  • Ensure the frequency matches the system requirements.
  • Review the power rating and any applicable certifications.
  • Make note of any specific manufacturer instructions.
  • Verify that barriers are intact and securely positioned.
  • Check for proper signage indicating high voltage areas.
  • Ensure safety equipment is accessible and functional.
  • Confirm that all personnel are aware of safety protocols.
  • Inspect for clear access routes in case of emergencies.

Electrical Testing

Functional Testing

Post-Testing Procedures

Final Safety Checks

Related Checklists