Horizontal drilling pre check
1. Equipment Readiness
Conduct a full inspection of the drill rig and associated equipment.
Test all hydraulic systems for leaks and proper operation.
Verify that all drilling tools and accessories are present and functioning.
Check the condition of the drill bits and ensure they are sharp and suitable for the job.
Here are some additional steps that could be included in the "Equipment Readiness" section of the New Horizontal Drilling pre-check checklist
Review the maintenance logs for all equipment to ensure timely servicing
Inspect the power supply systems, including generators and electrical connections, for proper functionality
Confirm that all safety devices and shut-off systems are operational and accessible
Test the communication systems (radios, intercoms) to ensure they are working properly
Ensure that all required spare parts and backup equipment are available on site
Verify that all tools and equipment are properly calibrated according to manufacturer specifications
Inspect the condition of hoses, cables, and connections for wear or damage
Check the fuel levels in all equipment and fill as necessary
Ensure that all equipment is properly labeled and that safety signage is displayed
Conduct a functionality test of the drill control systems to confirm responsiveness
Review emergency shut-down procedures with the crew and verify access to emergency equipment
These additional steps aim to enhance the thoroughness of the equipment readiness check and ensure all aspects of the drilling equipment are prepared for safe and efficient operation
2. Safety Protocols
Confirm that all crew members have completed safety orientation relevant to horizontal drilling.
Ensure that all necessary personal protective equipment (PPE) is available and in good condition.
Inspect the site for potential hazards and ensure proper signage is displayed.
Review lockout/tagout procedures for equipment maintenance.
3. Site Assessment
Ensure the drilling site is level and stable to support equipment.
Check for any underground utilities or potential hazards in the drilling path.
Confirm all environmental impact assessments are completed and reviewed.
Verify that access routes for emergency vehicles are clear.
4. Tool and Equipment Verification
Test the functionality of all electronic and mechanical tools used in the drilling process.
Inspect the condition of mud pumps, motors, and generators.
Ensure that all measuring and monitoring equipment is calibrated and operational.
Check that backup tools and spare parts are available on-site.
5. Fluid Management System
Review the drilling fluid formulation and ensure compatibility with geological conditions.
Inspect the fluid circulation system for any blockages or leaks.
Verify that the fluid mixing and delivery equipment is functioning correctly.
Confirm that the disposal methods for used drilling fluid are compliant with regulations.
6. Communication and Coordination
Ensure that all communication equipment is tested and functioning (radios, intercoms).
Review the communication plan and establish clear lines of communication among teams.
Set up a system for daily check-ins and updates during the drilling process.
7. Final Readiness Check
Conduct a team meeting to finalize the drilling plan and objectives.
Review contingency plans for potential issues that may arise during drilling.
Confirm that all personnel are aware of their roles and responsibilities.
Reaffirm readiness to initiate drilling operations and establish a start time.