HV cable soak test

Pre-Testing Preparations

  • Inspect personal protective equipment (PPE) such as gloves, helmets, and goggles.
  • Gather testing tools, including multimeters and insulation resistance testers.
  • Check for availability of emergency equipment like first aid kits and fire extinguishers.
  • Ensure all equipment is calibrated and functioning properly.
  • Inspect the testing area for any signs of water or dampness.
  • Clean the area to remove dust, debris, and contaminants.
  • Ensure proper ventilation to avoid buildup of harmful gases.
  • Confirm temperature and humidity levels are within acceptable ranges.
  • Check all cable connections for tightness and security.
  • Verify cable routing follows specified paths without sharp bends.
  • Inspect support structures for stability and integrity.
  • Ensure labeling and identification of cables are correct.
  • Obtain the relevant technical documentation for the cable.
  • Cross-check soak test parameters with manufacturer guidelines.
  • Confirm voltage levels and duration of the soak test.
  • Ensure compliance with industry standards and regulatory requirements.

Equipment Setup

Conducting the Soak Test

Post-Testing Procedures

Final Review and Reporting

Related Checklists