HVAC constructability checklist
1. Design Review
Verify HVAC system design complies with local codes and regulations.
Check that the design meets the specified performance requirements.
Ensure that all necessary calculations (load, duct, etc.) are completed and accurate.
Review design for compatibility with architectural and structural elements.
2. Equipment Selection
Confirm that selected equipment meets project specifications and efficiency standards.
Verify availability of equipment and lead times for procurement.
Check for compatibility with existing systems, if applicable.
Ensure that equipment is accessible for maintenance and service.
3. Installation Planning
Review installation sequence and coordination with other trades.
Verify that installation methods comply with manufacturer recommendations.
Ensure that the proposed installation does not obstruct other building elements.
Check for adequate space for ductwork, piping, and equipment.
4. Material Procurement
Confirm that all materials meet project specifications and quality standards.
Ensure that materials are ordered in a timely manner to meet project schedules.
Check that all required accessories and components are included in the orders.
Verify that materials are stored properly to prevent damage before installation.
5. On-Site Coordination
Schedule coordination meetings with subcontractors and other trades.
Ensure that installation areas are clear and accessible.
Verify that all necessary safety protocols and procedures are in place.
Confirm that there is a plan for managing and mitigating job site noise and air quality.
6. Quality Control
Establish inspection and testing protocols for installed systems.
Verify that installation meets design intent and manufacturer specifications.
Ensure that documentation is maintained for all inspections and tests.
Check for compliance with health and safety standards.
7. System Start-Up and Commissioning
Develop a start-up plan that includes system checks and balances.
Ensure that all controls are calibrated and functioning properly.
Perform functional testing of all HVAC components and systems.
Document commissioning results and address any deficiencies identified.
8. Final Review and Handover
Conduct a final walk-through with stakeholders to review the completed work.
Ensure all documentation (warranties, manuals, as-builts) is provided to the owner.
Confirm that all training for operating personnel is completed.
Obtain final sign-off from relevant parties before project closure.