Site Assessment and Preparation
Conduct feasibility studies
Evaluate environmental impacts
Assess water flow availability
Secure necessary permits and licenses
Prepare site layout and design
Design and Engineering
Select turbine type and size
Design dam and reservoir structures
Plan electrical system and grid connection
Develop construction drawings and specifications
Conduct risk assessments
Construction Phase
Mobilize construction crew and equipment
Excavate and prepare foundation for dam
Construct dam and reservoir
Install turbines and generators
Complete electrical and control systems installation
Testing and Commissioning
Perform individual component testing
Conduct system integration tests
Validate operational performance under load
Finalize safety inspections
Obtain regulatory approvals for operation
Operation and Maintenance
Implement routine maintenance schedules
Monitor water flow and power generation
Conduct regular inspections of equipment and structures
Manage environmental compliance
Update operational protocols as needed
Decommissioning (if applicable)
Develop a decommissioning plan
Safely dismantle equipment and structures
Restore the site to its natural state
Ensure proper disposal of materials
Conduct final environmental assessments