Improved subbase mixing and placing after rain based on BS

1. Pre-Construction Preparation

2. Site Assessment

3. Material Inspection

4. Mixing Process

5. Placement Procedures

6. Compaction Techniques

7. Quality Control Measures

8. Post-Construction Review

  • Conduct visual inspections for surface irregularities.
  • Test for load-bearing capacity using appropriate methods.
  • Assess drainage effectiveness through water flow observation.
  • Monitor any signs of settling or shifting in the subbase.
  • Check for standing water or pooling in the area.
  • Inspect joints and seams for signs of water penetration.
  • Evaluate the compaction levels using density testing.
  • Document any areas of concern for further analysis.
  • Compile data from inspections and tests conducted.
  • Provide a clear summary of identified issues.
  • Include visual aids such as photos or diagrams.
  • Outline actionable recommendations based on findings.