Improved subbase mixing and placing based on AASTHTO and ASTM

Material Selection

Equipment Calibration

Mixing Process

Placing Procedures

Compaction

Quality Control and Testing

Final Inspection and Acceptance

  • Check thickness and uniformity of the subbase layer.
  • Inspect surface for any visible defects or irregularities.
  • Measure compaction levels using appropriate testing methods.
  • Confirm that materials used meet specified standards.
  • Document findings and take photographs as evidence.
  • Review construction logs for accuracy and completeness.
  • Ensure all test results are recorded and available.
  • Confirm that change orders and approvals are documented.
  • Check that all required permits are obtained.
  • Compile a final project report for stakeholder review.
  • List all identified deficiencies from inspections.
  • Develop a plan for correction with timelines.
  • Assign responsibility for addressing each deficiency.
  • Verify completion of corrections through follow-up inspections.
  • Document rectifications and confirm compliance with specifications.
  • Prepare all required documentation for submission.
  • Schedule a meeting with stakeholders for final review.
  • Present inspection results and compliance documentation.
  • Address any questions or concerns from authorities.
  • Secure written approvals and signatures as needed.

Related Checklists