instrumentation pre commissioning check list
1. Documentation Review
Verify instrument data sheets are complete and accurate.
Check installation drawings against as-built conditions.
Review test procedures and acceptance criteria.
2. Visual Inspection
Inspect physical installation of instruments for proper mounting.
Check for physical damage or corrosion on instruments and wiring.
Ensure proper labeling and tagging of instruments.
3. Electrical Checks
Verify instrument power supply connections and voltage levels.
Check grounding connections for integrity and compliance.
Test cable insulation resistance and continuity.
4. Calibration Verification
Ensure instruments are calibrated to manufacturer's specifications.
Document calibration certificates and records.
Verify calibration against reference standards where applicable.
5. Functional Testing
Conduct functional tests to ensure instruments operate as intended.
Test alarms and interlocks for proper response.
Verify signal outputs against expected values.
6. Communication Checks
Test communication protocols (e.g., HART, Modbus) for correct functionality.
Confirm connectivity with control systems and data loggers.
Verify configuration settings in the control system.
7. Safety Checks
Review safety interlocks and emergency shut-off systems.
Confirm compliance with safety regulations and standards.
Conduct risk assessments for potential hazards.
8. Final Documentation
Compile all test results and findings in a final report.
Ensure all discrepancies are documented and resolved.
Submit final documentation for approval before commissioning.