Your checklists (
0
)
AI Checklist Generator
From the makers of
Manifestly Checklists
Sign in
Email address
Email me a magic link
Home
> Isolation Transformer GA Drawing Checklist
Isolation Transformer GA Drawing Checklist
General Information
Confirm project title and number are clearly indicated.
Ensure date of drawing creation and revision history are documented.
Verify the drawing scale is noted and appropriate.
Transformer Specifications
Check that transformer rating (kVA, voltage, phase) is specified.
Ensure core material and type are noted (e.g., silicon steel).
Confirm insulation class is indicated.
Dimensional Details
Verify overall dimensions of the transformer are included.
Ensure center of gravity and lifting points are marked.
Check for clearances and spacing details around the transformer.
Electrical Connections
Confirm primary and secondary winding configurations are shown.
Ensure terminal markings are clear and correctly labeled.
Verify that grounding details are included.
Cooling and Ventilation
Check that cooling method (oil, air, etc.) is specified.
Ensure ventilation requirements and air flow directions are indicated.
Confirm that any cooling systems are detailed (e.g., fans, pumps).
Safety and Compliance
Verify that safety features (fuses, breakers) are noted.
Ensure compliance with relevant standards and codes is indicated.
Check for warning labels and signage requirements included in the drawing.
Bill of Materials
Confirm that a bill of materials (BOM) is included.
Ensure all components are listed with quantities and specifications.
Check for supplier information or part numbers where applicable.
Review and Approval
Verify that the drawing has been reviewed by relevant engineers.
Ensure appropriate signatures for approval are present.
Check for any notes on revisions or comments from reviewers.
Download CSV
Download JSON
Download Markdown
Use in Manifestly