liquid rocket ignition checklist

Pre-Ignition Checklist

  • Distribute safety protocol documentation to all team members.
  • Schedule a meeting to discuss protocols and address questions.
  • Conduct a brief quiz to confirm understanding.
  • Require signatures from personnel acknowledging comprehension.
  • Conduct a physical inspection of the launch site perimeter.
  • Ensure security personnel are stationed at access points.
  • Use communication systems to confirm site status.
  • Document any unauthorized personnel encountered.
  • Review all required documentation for completeness.
  • Check with regulatory agencies for final approvals.
  • Ensure copies of permits are accessible on-site.
  • Confirm all team members are aware of permit requirements.
  • Obtain current weather data from a reliable source.
  • Evaluate wind speed, temperature, and precipitation forecasts.
  • Consult with meteorological experts if necessary.
  • Document findings and communicate with the team.
  • Inspect all equipment for functionality and readiness.
  • Verify that fuel supplies are adequate and properly stored.
  • Test communication systems and emergency equipment.
  • Document any issues and schedule repairs as needed.

Propellant Preparation

Engine System Checks

Launch Sequence Verification

Post-Ignition Procedures