maintenance of Power Centre

1. Preliminary Inspections

2. Electrical Systems

  • Use a torque wrench for connections.
  • Check for signs of oxidation or rust.
  • Tighten loose connections to manufacturer specifications.
  • Replace corroded connectors as necessary.
  • Document findings and corrective actions.
  • Switch off power to the circuit.
  • Manually toggle circuit breakers to test trip mechanism.
  • Replace any blown fuses with the correct rating.
  • Ensure breakers reset properly after testing.
  • Log results for future reference.
  • Inspect ground rods and connections for integrity.
  • Test grounding resistance with an earth resistance tester.
  • Verify all equipment is properly grounded.
  • Repair or replace faulty ground connections.
  • Document grounding test results.
  • Use a multimeter to measure voltage.
  • Record voltage readings at each distribution point.
  • Compare readings against specified limits.
  • Identify and rectify any discrepancies.
  • Maintain a log of voltage levels.
  • Examine insulation for cracks, fraying, or discoloration.
  • Check for exposure to heat or moisture.
  • Replace damaged wiring promptly.
  • Ensure all repairs comply with safety standards.
  • Document inspection outcomes.
  • Perform a load test on generators.
  • Check UPS battery health and charge levels.
  • Simulate power outages to test response.
  • Inspect all connections and controls.
  • Record performance data for review.
  • Check labeling for clarity and accuracy.
  • Ensure panels are free from obstructions.
  • Update any outdated or incorrect labels.
  • Maintain a clear access path to each panel.
  • Document any changes made.
  • Check for signs of overheating or leaks.
  • Verify coolant levels meet manufacturer specifications.
  • Inspect connection tightness and integrity.
  • Clean any debris around transformers.
  • Document inspection findings.
  • Review monitoring system settings and configurations.
  • Calibrate sensors according to manufacturer guidelines.
  • Test data accuracy and response times.
  • Document any issues and corrective actions.
  • Ensure systems are logged for reference.
  • Use a power quality analyzer to measure harmonics.
  • Identify sources of excessive harmonics.
  • Implement filtering solutions if needed.
  • Document harmonic levels and actions taken.
  • Schedule follow-up assessments.
  • Review local code requirements regularly.
  • Inspect installations for code compliance.
  • Document and rectify any violations.
  • Consult with a licensed electrician as needed.
  • Maintain a record of compliance checks.
  • Gather current schematics and documentation.
  • Compare against existing installations.
  • Update diagrams to reflect any changes.
  • Ensure all stakeholders have access to updated versions.
  • Archive previous versions for reference.
  • Use a thermal camera to scan all panels.
  • Identify and record any hotspots detected.
  • Investigate causes of elevated temperatures.
  • Implement corrective measures as needed.
  • Document scan results for future reference.
  • Inspect SPD status indicators.
  • Test functionality according to manufacturer guidelines.
  • Replace any non-functioning devices.
  • Document test results and any replacements.
  • Ensure compliance with installation standards.
  • Remove dust and debris from enclosures.
  • Ensure ventilation openings are unobstructed.
  • Inspect seals for wear and replace if necessary.
  • Check for overheating signs during operation.
  • Document cleaning activities and findings.

3. Mechanical Systems

4. Cooling Systems

5. Safety Equipment

6. Documentation and Reporting

7. Final Checks

Related Checklists